BID SUMMARYBID OPENINGDATE: November 2, 2022TIME: 3:00 P.M.LOCATION: City Clerk's OfficeITEMNO.ITEM UNIT COST ITEM COSTPrepared by: M. GoralkaAnnual Street Paving 2021-23Date Approved:November 2, 2022PROJECT TITLE:Curb Ramp Upgrades forPROJECT NO.:BID NO.:ENGINEER'S ESTIMATE2022.005022-23.003QUANTITYBID ALTERNATE A1A. Mobilization, Staging, and Stockpiling per Section 7-8.4 and 9-3.41 LS $15,000.00 $15,000.00 2A. Temporary Traffic Control per Section 6001 LS $20,000.00 $20,000.00 3A. Curb Cut Ramp Type A or B per Section 303-5.94 EA $7,500.00 $30,000.00 4A. Curb Cut Ramp Type C or D per Section 303-5.944 EA $6,500.00 $286,000.00 5A. Dome and Landing Replacement per Section 303-5.916 EA $3,500.00 $56,000.00 6A. Gutter Replacement per Section 303-5.922 EA $1,200.00 $26,400.00 7A. Not Used -- -- -- $0.00 8A. Sidewalk per Section 303-5.9 1100 SF $25.00 $27,500.00 9A. Curb and Gutter per Section 303-5.9 180 LF $115.00 $20,700.00 10A. AC Tie In per Section 302-5.9 250 SF $40.00 $10,000.00 11A. Concrete Valley Gutter / Apron per Section 303-5.9300 SF $38.00 $11,400.00 12A. Not Used -- -- -- $0.00 13A. Not Used -- -- -- $0.00 TOTAL BID ALTERNATE A:$503,000.00 TOTAL BASE BID:TOTAL BASE BID + ALTERNATE BID ITEM A:$2,809,550.00$3,312,550.00JJR Construction, Inc. FBD Vanguard Construction, Inc. Sposeto Engineering, Inc.1120 Ninth Avenue 550 Greenville Road 4558 Contractors PlaceSan Mateo, CA 94402 Livermore, CA 94550 Livermore, CA 94551Phone: (650) 343-6109 Phone: (925) 245-1300 Phone: (925) 443-4200Fax: (650) 343-6207 Fax: (925) 245-1007 Fax: (925) 443-6800UNIT COST UNIT COST UNIT COSTITEM COST ITEM COST ITEM COST$4,000.00 $4,000.00 $50,000.00 $50,000.00 $14,000.00 $14,000.00$9,136.94 $9,136.94 $26,252.00 $26,252.00 $12,000.00 $12,000.00$6,842.09 $27,368.36 $9,000.00 $36,000.00 $7,000.00 $28,000.00 **$5,194.65 $228,564.60 $8,000.00 $352,000.00 $6,400.00 $281,600.00$3,352.76 $53,644.16 $5,025.00 $80,400.00 $3,400.00 $54,400.00$1,808.23 $39,781.06 $2,000.00 $44,000.00 $1,400.00 $30,800.00$0.00 $0.00 $0.00$23.84 $26,224.00 $14.00 $15,400.00 $18.00 $19,800.00$123.79 $22,282.20 $40.00 $7,200.00 $113.00 $20,340.00$41.88 $10,470.00 $35.00 $8,750.00 $23.00 $5,750.00$57.48 $17,244.00 $20.00 $6,000.00 $40.00 $12,000.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$438,715.32 $626,002.00 $478,690.00$2,455,890.58 $2,560,115.00$2,894,605.90$2,631,350.00$3,186,117.00 $3,110,040.00MJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 5 of 6Printed 11/3/2022 @ 5:11 PM
|