Laserfiche WebLink
BID SUMMARYBID OPENINGSpencon Construction Kerex Engineering, Inc. Rosas Brothers ConstructionDATE: November 2, 20223170 Crow Canyon Pl. #250 4941 Pacheco Blvd. 4731 Coliseum WayTIME: 3:00 P.M.San Ramon, CA 94583 Martinez, CA 94553 Oakland, CA 94601LOCATION: City Clerk's OfficePhone: (925) 984-2581 Phone: (925) 387-8913 Phone: (510) 534-1077Fax: (925) 984-2583 Fax: (925) 387-0853 Fax: (510) 534-5077ITEMNO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COSTBASE BID1 Mobilization, Staging, and Stockpiling per Section 7-8.4 and 9-3.41 LS $50,000.00 $50,000.00 $10,000.00 $10,000.00 $100,000.00 $100,000.00 $5,000.00 $5,000.002 Temporary Traffic Control per Section 6001 LS $75,000.00 $75,000.00 $50,000.00 $50,000.00 $75,000.00 $75,000.00 $5,000.00 $5,000.003 Curb Cut Ramp Type A or B per Section 303-5.996 EA $7,500.00 $720,000.00 $5,000.00 $480,000.00 $5,250.00 $504,000.00 $7,600.00 $729,600.004 Curb Cut Ramp Type C or D per Section 303-5.9187 EA $6,500.00 $1,215,500.00 $5,000.00 $935,000.00 $5,150.00 $963,050.00 $6,750.00 $1,262,250.005 Dome and Landing Replacement per Section 303-5.960 EA $3,500.00 $210,000.00 $2,300.00 $138,000.00 $2,900.00 $174,000.00 $1,500.00 $90,000.006 Gutter Replacement per Section 303-5.929 EA $1,200.00 $34,800.00 $2,500.00 $72,500.00 $2,750.00 $79,750.00 $1,200.00 $34,800.007 Retaining Curb Replacement per Section 303-5.94 EA $1,000.00 $4,000.00 $1,500.00 $6,000.00 $3,000.00 $12,000.00 $3,000.00 $12,000.008 Sidewalk per Section 303-5.9 7500 SF $25.00 $187,500.00 $16.00 $120,000.00 $15.00 $112,500.00 $8.00 $60,000.009 Curb and Gutter per Section 303-5.9 1200 LF $115.00 $138,000.00 $95.00 $114,000.00 $100.00 $120,000.00 $50.00 $60,000.0010 AC Tie In per Section 302 -5.9 1500 SF $40.00 $60,000.00 $15.00 $22,500.00 $25.00 $37,500.00 $20.00 $30,000.0011 Concrete Valley Gutter / Apron per Section 303-5.92000 SF $38.00 $76,000.00 $40.00 $80,000.00 $34.00 $68,000.00 $40.00 $80,000.0012 Curb Storm Inlet Adjustment within Ramp Flare per 303-1.1.120 EA $1,000.00 $20,000.00 $1,500.00 $30,000.00 $4,000.00 $80,000.00 $1,800.00 $36,000.0013 Relocate roadside sign on new post per Section 31525 EA $750.00 $18,750.00 $450.00 $11,250.00 $450.00 $11,250.00 $500.00 $12,500.00TOTAL BASE BID:$2,809,550.00 $2,069,250.00 $2,337,050.00 $2,417,150.00This document is a summary of bids received for the subject project and are provided only as a convenience. Listing of a particular bid is not a finding that such bid has been found to be responsive or accepted as complete by the City. An award of contract, if any, is subject to approval of the City Council and/or the City Manager. Contractors should refer to the contract documents for bidding information. Prepared by: M. GoralkaAnnual Street Paving 2021-23Date Approved:November 2, 2022PROJECT TITLE:Curb Ramp Upgrades forPROJECT NO.:BID NO.:ENGINEER'S ESTIMATE2022.005022-23.003QUANTITY ITEM COST ITEM COST ITEM COSTMJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 1 of 6Printed 11/3/2022 @ 5:11 PM