Laserfiche WebLink
BID SUMMARY <br /> <br />FEDERAL PROJECT NO.:STPL-5041 (048) <br />BID OPENING Redgwick Construction Company McGuire and Hester DeSilva Gates Construction, Inc.Ray's Electric <br />DATE: February 28, 2023 Date Approved: 2 Feb 21, 2023 21 Hegenberger Ct.2810 Harbor Bay Parkway 11555 Dublin Blvd.411 Pendleton Way, Suite B <br />TIME: 3:00 pm Oakland, CA 94621 Alameda, CA 94603 Dublin, CA 94568 Oakland, CA 94621 <br />LOCATION: City Clerk's Office Phone: (510) 792-1727 Phone: (510) 632-7676 Phone: (925) 829-9220 Phone: (510) 577-7700 <br />Fax: (510) 792-1728 Fax: (510) 562-5209 Fax: (925) 803-4263 Fax: (510) 577-7706 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST UNIT COST <br />BASE BID <br />1 Mobilization per Section 9-3.4 1 LS $63,000.00 $63,000.00 $72,700.00 $72,700.00 $169,153.00 $169,153.00 **$115,000.00 $115,000.00 $214,000.00 $214,000.00 <br />2 Construction Area Signs & Traffic <br />Control per Section 601 <br />1 LS $63,000.00 $63,000.00 $73,800.00 $73,800.00 $4,400.00 $4,400.00 $115,000.00 $115,000.00 $80,000.00 $80,000.00 <br />3 Portable Changeable Message Sign 2 EA $2,500.00 $5,000.00 $2,500.00 $5,000.00 $6,200.00 $12,400.00 $4,500.00 $9,000.00 $5,000.00 $10,000.00 <br />4 Stormwater Pollution Control 1 LS $10,000.00 $10,000.00 $31,500.00 $31,500.00 $14,000.00 $14,000.00 $5,000.00 $5,000.00 $12,675.00 $12,675.00 <br />5 Construction Staking 1 LS $45,000.00 $45,000.00 $14,500.00 $14,500.00 $16,500.00 $16,500.00 $6,500.00 $6,500.00 $6,500.00 $6,500.00 <br />6 Utility Potholing 1 LS $20,000.00 $20,000.00 $42,500.00 $42,500.00 $24,000.00 $24,000.00 $25,000.00 $25,000.00 $50,000.00 $50,000.00 <br />7 Remove Traffic Striping Pavement <br />Markings and Delineators <br />1 LS $10,000.00 $10,000.00 $9,500.00 $9,500.00 $5,900.00 $5,900.00 $5,000.00 $5,000.00 $5,500.00 $5,500.00 <br />8 Remove Storm Drain Arch Culvert 196 LF $25.00 $4,900.00 $50.00 $9,800.00 $367.00 $71,932.00 $80.00 $15,680.00 $78.00 $15,288.00 <br />9 Remove Storm Drain Catch Inlet 1 EA $1,500.00 $1,500.00 $2,000.00 $2,000.00 $2,600.00 $2,600.00 $2,700.00 $2,700.00 $2,675.00 $2,675.00 <br />10 Remove Storm Drain Manhole 2 EA $1,500.00 $3,000.00 $2,200.00 $4,400.00 $4,800.00 $9,600.00 $3,500.00 $7,000.00 $3,525.00 $7,050.00 <br />11 Adjust Storm Drain Manhole Cover to <br />Grade <br />3 EA $1,000.00 $3,000.00 $1,500.00 $4,500.00 $2,000.00 $6,000.00 $1,400.00 $4,200.00 $1,325.00 $3,975.00 <br />12 Adjust Monument Box to Grade 5 EA $1,000.00 $5,000.00 $900.00 $4,500.00 $1,700.00 $8,500.00 $2,200.00 $11,000.00 $1,425.00 $7,125.00 <br />13 Replace Portland Concrete Base <br />(Revocable) <br />1,400 SY $65.00 $91,000.00 $87.00 $121,800.00 $176.00 $246,400.00 $165.00 $231,000.00 $400.00 $560,000.00 <br />14 Grind Asphalt Concrete Over Existing <br />Gutter Pan <br />415 LF $15.00 $6,225.00 $12.00 $4,980.00 $9.00 $3,735.00 $40.00 $16,600.00 $8.00 $3,320.00 <br />15 Cold Milling (Varies up to 10.5-inch <br />Thick) <br />6,600 SY $18.00 $118,800.00 $18.00 $118,800.00 $19.00 $125,400.00 $35.00 $231,000.00 $18.10 $119,460.00 <br />15a.Cold Milling (Varies up to 5-inch Thick)220 SY $12.00 $2,640.00 $32.00 $7,040.00 $31.00 $6,820.00 $35.00 $7,700.00 $33.50 $7,370.00 <br />15b.12-Inch-Thick Full Depth Asphalt <br />Replacement with RHMA <br />2,800 SF $15.00 $42,000.00 $22.00 $61,600.00 $21.00 $58,800.00 $45.00 $126,000.00 $24.00 $67,200.00 <br />16 Rubberized Hot Mix Asphalt (RHMA-G) <br />with ½-inch Aggregate <br />1,350 TN $150.00 $202,500.00 $245.00 $330,750.00 $279.00 $376,650.00 $280.00 $378,000.00 $264.00 $356,400.00 <br />17 GlassGrid 8511 TF Pavement Fabric or <br />Approved Equal <br />7,131 SY $6.00 $42,786.00 $16.00 $114,096.00 $14.00 $99,834.00 $12.00 $85,572.00 $14.75 $105,182.25 <br />18 Curb and Gutter 617 LF $150.00 $92,550.00 $112.00 $69,104.00 $106.00 $65,402.00 $100.00 $61,700.00 $120.00 $74,040.00 <br />19 Driveway Approach (8-inch PCC)391 SF $25.00 $9,775.00 $35.00 $13,685.00 $34.00 $13,294.00 $31.00 $12,121.00 $50.00 $19,550.00 <br />20 Replace Curb and Gutter after Grinding <br />(Revocable) <br />240 LF $100.00 $24,000.00 $100.00 $24,000.00 $106.00 $25,440.00 $100.00 $24,000.00 $120.00 $28,800.00 <br />21 Adjust Water Meter (Service) Box <br />Cover to Grade in Concrete <br />4 EA $600.00 $2,400.00 $450.00 $1,800.00 $1,200.00 $4,800.00 $200.00 $800.00 $425.00 $1,700.00 <br />22 Replace Pull Box 10 EA $500.00 $5,000.00 $500.00 $5,000.00 $700.00 $7,000.00 $1,000.00 $10,000.00 $2,330.00 $23,300.00 <br />23 Reset Street Furniture 7 EA $200.00 $1,400.00 $200.00 $1,400.00 $660.00 $4,620.00 $500.00 $3,500.00 $1,600.00 $11,200.00 <br />24 12-inch RCP Storm Drain (including <br />Backfill) <br />214 LF $350.00 $74,900.00 $446.00 $95,444.00 $500.00 $107,000.00 $700.00 $149,800.00 $685.93 $146,789.02 <br />25 Pipe Connection to Existing Manhole 1 LS $800.00 $800.00 $2,500.00 $2,500.00 $6,300.00 $6,300.00 $5,000.00 $5,000.00 $4,750.00 $4,750.00 <br />26 Storm Drain Curb Inlet with Trash <br />Capture Device <br />4 EA $6,500.00 $26,000.00 $11,000.00 $44,000.00 $11,800.00 $47,200.00 $17,000.00 $68,000.00 $12,100.00 $48,400.00 <br />27 Modified Storm Drain Curb Inlet (Bubble <br />Up Structure) <br />1 EA $12,000.00 $12,000.00 $7,500.00 $7,500.00 $13,600.00 $13,600.00 $9,000.00 $9,000.00 $3,675.00 $3,675.00 <br />28 Storm Drain Manhole (City Standard) 2 EA $8,000.00 $16,000.00 $12,000.00 $24,000.00 $11,700.00 $23,400.00 $9,000.00 $18,000.00 $8,675.00 $17,350.00 <br />29 Storm Drain Manhole (ACFCD Type II)1 EA $8,500.00 $8,500.00 $31,000.00 $31,000.00 $91,400.00 $91,400.00 $21,000.00 $21,000.00 $21,500.00 $21,500.00 <br />30 Reset or Relocate Sign Post 5 EA $500.00 $2,500.00 $300.00 $1,500.00 $300.00 $1,500.00 $500.00 $2,500.00 $300.00 $1,500.00 <br />31 Sign and Post 4 EA $750.00 $3,000.00 $550.00 $2,200.00 $525.00 $2,100.00 $800.00 $3,200.00 $525.00 $2,100.00 <br />32 Thermoplastic Pavement Markers <br />(Various Legend) <br />312 UNIT $5.50 $1,716.00 $8.00 $2,496.00 $8.00 $2,496.00 $15.00 $4,680.00 $8.00 $2,496.00 <br />33 Thermoplastic Pavement Markers (Multi- <br />Colored Crosswalk) <br />624 UNIT $6.50 $4,056.00 $8.00 $4,992.00 $8.00 $4,992.00 $35.00 $21,840.00 $8.00 $4,992.00 <br />34 Thermoplastic Pavement Stripe – 12” <br />Wide White Stripe <br />1,010 UNIT $1.50 $1,515.00 $10.00 $10,100.00 $8.00 $8,080.00 $8.00 $8,080.00 $8.00 $8,080.00 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the City. <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />City Manager. Contractors should refer to the contract documents for bidding <br />information. <br />PROJECT TITLE:Washington Ave Reconstruction <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2018.4020 <br />22-23.002 <br />QUANTITY ITEM COST <br />Prepared by: M. Chaudhary <br />ITEM COST ITEM COST ITEM COST <br />Washington Ave Reconstruction Rev Page 1 of 3 Printed 3/2/2023 @ 10:22 AM