Laserfiche WebLink
BID SUMMARY <br />FEDERAL PROJECT NO.:STPL-5041 (048) <br />BID OPENING Redgwick Construction Company McGuire and Hester DeSilva Gates Construction, Inc.Ray's Electric <br />DATE: February 28, 2023 Date Approved: 2 Feb 21, 2023 21 Hegenberger Ct.2810 Harbor Bay Parkway 11555 Dublin Blvd.411 Pendleton Way, Suite B <br />TIME: 3:00 pm Oakland, CA 94621 Alameda, CA 94603 Dublin, CA 94568 Oakland, CA 94621 <br />LOCATION: City Clerk's Office Phone: (510) 792-1727 Phone: (510) 632-7676 Phone: (925) 829-9220 Phone: (510) 577-7700 <br />Fax: (510) 792-1728 Fax: (510) 562-5209 Fax: (925) 803-4263 Fax: (510) 577-7706 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST UNIT COST <br />PROJECT TITLE:Washington Ave Reconstruction <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2018.4020 <br />22-23.002 <br />QUANTITY ITEM COST <br />Prepared by: M. Chaudhary <br />ITEM COST ITEM COST ITEM COST <br />35 Thermoplastic Pavement Stripe – <br />Parking Tee <br />200 UNIT $2.50 $500.00 $5.00 $1,000.00 $5.00 $1,000.00 $5.00 $1,000.00 $5.00 $1,000.00 <br />36 Thermoplastic Pavement Stripe – Detail <br />2 <br />40 UNIT $1.50 $60.00 $2.50 $100.00 $2.50 $100.00 $5.00 $200.00 $2.30 $92.00 <br />37 Thermoplastic Pavement Stripe – Detail <br />22 <br />1,215 UNIT $2.00 $0.00 $6.00 $7,290.00 $4.60 $5,589.00 $5.00 $6,075.00 $4.60 $5,589.00 <br />38 Thermoplastic Pavement Stripe - Detail <br />27B <br />38 UNIT $1.50 $57.00 $3.00 $114.00 $3.00 $114.00 $5.00 $190.00 $3.00 $114.00 <br />39 Thermoplastic Pavement Stripe - Detail <br />39 <br />70 UNIT $2.00 $140.00 $3.00 $210.00 $2.50 $175.00 $5.00 $350.00 $2.50 $175.00 <br />40 Red Curb Paint 100 UNIT $2.00 $200.00 $5.00 $500.00 $4.00 $400.00 $5.00 $500.00 $4.00 $400.00 <br />41 Two-Way Reflective Blue Pavement <br />Marker <br />2 UNIT $30.00 $60.00 $18.00 $36.00 $15.00 $30.00 $49.00 $98.00 $15.00 $30.00 <br />42 Modification – Washington Avenue and W 1 UNIT $140,500.00 $140,500.00 $190,000.00 $190,000.00 $145,000.00 $145,000.00 $185,000.00 $185,000.00 $175,000.00 $175,000.00 <br />43 Traffic Signal Modification – <br />Washington Avenue and Castro Street <br />1 UNIT $138,100.00 $138,100.00 $190,000.00 $190,000.00 $145,000.00 $145,000.00 $185,000.00 $185,000.00 $192,000.00 $192,000.00 <br />44 Adjust ACFCD Storm Drain Manhole <br />Cover to Grade <br />2 UNIT $1,000.00 $2,000.00 $1,800.00 $3,600.00 $2,600.00 $5,200.00 $2,000.00 $4,000.00 $1,965.00 $3,930.00 <br />TOTAL BASE BID:$1,307,080.00 $1,993,856.00 **$2,202,586.00 $2,432,272.27 <br />NON-PARTICIPATING BID ITEMS <br />45 Curb Ramp (Including Truncated Dome <br />and Retaining Curb) <br />13 EA $6,500.00 $84,500.00 $7,000.00 $91,000.00 $6,400.00 $83,200.00 $6,300.00 $81,900.00 $7,000.00 $91,000.00 <br />46 Sidewalk (4-Inch PCC)3073 SF $20.00 $61,460.00 $23.00 $70,679.00 $24.00 $73,752.00 $18.00 $55,314.00 $34.00 $104,482.00 <br />47 Adjust Sanitary Sewer Manhole Cover <br />to Grade (CoSL) <br />8 EA $1,000.00 $8,000.00 $1,800.00 $14,400.00 $2,600.00 $20,800.00 $1,400.00 $11,200.00 $1,325.00 $10,600.00 <br />48 Adjust Water Valve Cover to Grade <br />(EBMUD) <br />22 EA $600.00 $13,200.00 $700.00 $15,400.00 $1,600.00 $35,200.00 $1,000.00 $22,000.00 $985.00 $21,670.00 <br />TOTAL NON-PARTICIPATING BID ITEMS:$167,160.00 $191,479.00 $212,952.00 **$170,414.00 $227,752.00 <br />TOTAL BASE BID:** <br />TOTAL BASE BID + NON-PARTICIPATING BID ITEMS: <br />REQUIRED DOCUMENTATION: <br />SUBCONTRACTORS: <br />NOTES: <br />Pale Horse Asphalt <br />Golden Bay Construction Inc. <br />Compass Engineering <br />Contractors <br />Addendum #1 YES YES YES <br />Rosas Brothers <br />YES <br />Construction Survey, Inc.Pale Horse <br />N/A TO BE SUBMITTED UPON <br />REQUEST N/A <br />Section 3 - Good Faith Effort RECEIVED NOT RECEIVED NOT RECEIVED RECEIVED <br />DBE Goal- 24% Met <br />NOT SUBMITTED <br />Compass Engineering <br />Contractors <br />$2,202,586.00 <br />$2,373,000.00 <br />$2,432,272.27 <br />YES <br />$2,660,024.27 <br />YES <br />YES <br />$1,767,337.00 <br />YES <br />YES YES <br />$1,993,856.00$1,307,080.00 $1,767,337.00 <br />DBE-Good Faith Effort <br />NO <br />$2,206,808.00 <br />Bid Bond <br />NO <br />$1,474,240.00 $1,958,816.00 <br />Tully consulting Group <br />Bay Area Lightworks <br />Rosas Brothers <br />A1 Trucking Services, Inc. <br />ABSL Construction <br />Total Traffic Control <br />Bay Area Lightworks <br />Anrak <br />Compass Engineering <br />Rosas Brothers <br />McGuire & Hester <br />Construction Survey <br />TDW Construction <br />CMC Traffic Control <br />Tully Consulting Group <br />Bay Line Cutting & Coring <br />Pale Horse Asphalt <br />Bay Area Lightworks, Inc. <br />Striping Graphics <br />TDW Construction, Inc. <br />** Math Error Corrected <br />Washington Ave Reconstruction Rev Page 2 of 3 Printed 3/2/2023 @ 10:22 AM