My WebLink
|
Help
|
About
|
Sign Out
Home
10E CONSENT
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230605
>
10E CONSENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:52:44 PM
Creation date
6/8/2023 3:10:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/5/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: June 5, 2023 <br />Agenda Number: 10.e. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 23-162 <br />File Type: Staff Report <br />Adopt a Resolution to Award a $893,400 Construction Contract to Sposeto Engineering Inc. for the Curb <br />Ramp Upgrades for Annual Street Seal 2021-2023 Project, Project No. 2022.0070; to Authorize the City <br />Manager to Negotiate and Approve Individual Change Orders Up to 5% (or $44,670) of the Original <br />Contract Amount; and to Authorize the City Manager to Negotiate and Approve Change Orders up to a <br />Cumulative Value not to Exceed 25% (or $223,350) of the Original Contract Amount <br />COUNCIL PRIORITY <br />·Infrastructure <br />SUMMARY AND RECOMMENDATIONS <br />This contract provides for the installation or upgrade of ninety-five concrete curb ramps in the <br />2021-2023 Asphalt Maintenance Zone work area. The asphalt maintenance treatment contract <br />work will be awarded as a separate construction contract. <br />Staff recommends the following actions: <br />·Award a construction contract to Sposeto Engineering Inc. in the amount of $893,400 for <br />the Curb Ramp Upgrades for Annual Street Seal 2021-2023 Project, Project No. <br />2022.0070 <br />·Authorize the City Manager to negotiate and approve individual change orders up to 5% <br />(or $44,670) of the original contract amount; and <br />·Authorize the City Manager to negotiate and approve change orders up to a cumulative <br />value of 25% (or $223,350) of the original contract amount <br />BACKGROUND <br />The Americans with Disabilities Act (ADA) mandates construction of curb ramps at street <br />intersections when roadway pavement is replaced, overlaid, or treated with a cape seal. This <br />contract will install ramps at locations scheduled for pavement work as part of the upcoming <br />Annual Street Sealing Fiscal Year 2021-2023 project. The contract will install new ramps at <br />locations where none exists and upgrade existing non-compliant ramps. This contract will install <br />upgrades to approximately ninety-five concrete curb ramps. <br /> <br />Curb ramps are a vital component of pedestrian travel. Curb ramps allow wheelchair users to <br />safely cross streets. Curb ramps make sidewalks accessible, regardless of physical ability. <br />Each curb ramp includes a panel of raised domes to warn the vision impaired of a street <br />crossing. <br />This work is part of the Annual Street Sealing 2021-2023 Project scheduled for construction in <br />Page 1 City of San Leandro Printed on 5/31/2023
The URL can be used to link to this page
Your browser does not support the video tag.