Laserfiche WebLink
<br />MTC Programming & Allocations Section April. 2023 TDA Article 3 Model Resolution - Page 1 <br />Resolution No. 2023-XXX <br />Page 1 of 2 <br />Attachment B <br />TDA Article 3 Project Application Form <br />1. Agency City of San Leandro <br />2. Primary Contact Sheila Marquises <br />3. Mailing Address 835 E. 14th Street San Leandro, CA 94577 <br />4. Email Address smarquises@sanleandro.org 5. Phone Number (510)577-3433 <br />6. Secondary Contact <br />(in the event primary <br />is not available) <br />Nick Thom <br />7. Mailing address (if <br />different) N/A☐ <br />835 E. 14th Street San Leandro, CA 94577 <br />8. Email Address nthom@sanleandro.org 9. Phone Number <br />10. Send allocation <br />instructions to (if <br />different from above): <br /> <br />11. Project Title Pedestrian Curb Ramp and Pedestrian Crossing Equipment <br />12. Amount requested $141,443 13. Fiscal Year of <br />Claim <br />2023-2024 <br /> <br />14. Description of Overall Project: <br /> <br />15. Project Scope Proposed for Funding: (Project level environmental, preliminary planning, and ROW <br />are ineligible uses of TDA funds.) <br /> <br />16. Project Location: A map of the project location is attached or a link to an online map of the <br />project location is provided below: <br /> <br /> <br />Installation of pedestrian curb ramps and crossing equipment to improve safety at various locations throughout the City. <br />This project will provide for the design, procurement, construction and inspection of pedestrian curb ramps and <br />pedestrian crossing equipment at various locations throughout the City. <br />Various locations in San Leandro. <br /> <br />