My WebLink
|
Help
|
About
|
Sign Out
Home
10H CONSENT
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230605
>
10H CONSENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:37:55 AM
Creation date
6/8/2023 3:10:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/5/2023
Retention
PERM
Document Relationships
Reso 23-063 Cost-Neutral License Agreement with East Bay Community Energy
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: June 5, 2023 <br />Agenda Number: 10.h. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 23-233 <br />File Type: Staff Report <br />COUNCIL PRIORITY <br />·Infrastructure <br />·Sustainability & Resiliency <br />·Community & Business Development <br />SUMMARY <br />The proposed master site license agreement will allow East Bay Community Energy (EBCE), a <br />Joint Powers Authority, to install, operate, and maintain Direct Current Fast Chargers (DCFC) to <br />fuel electric vehicles (EV) at multiple municipal facilities. As shown in Exhibit A of the master <br />license agreement, EV-only parking stalls will be assessed for feasibility, and may be installed at <br />one or more parking lots or garages. EBCE’s standard project design is a minimum of 10-dual <br />port DCFCs at each project site. However, EBCE ’s feasibility assessments may reveal that size <br />and volume of chargers at certain specific sites may need to be modified based on available <br />parking stalls and electrical capacity at the site. All DCFCs will be available for use by the public, <br />via payment of dynamic rates that will vary over time based on market conditions. EBCE will pay <br />for the installation, operation, maintenance, and electricity costs. This agreement allows EBCE to <br />operate these EV fast chargers and associated electrical equipment on City of San Leandro <br />(City) property for 15 years. <br />RECOMMENDATIONS <br />Staff recommends the City Council adopt a resolution to approve and authorize the City Manager <br />to execute a license agreement with East Bay Community Energy, a Joint Powers Authority of <br />which the City of San Leandro is a member agency, for installing, operating, and maintaining <br />electric vehicle fast chargers at multiple municipal facilities at no cost to the City. <br />BACKGROUND <br />Vehicle electrification is an important strategy for air quality improvement and is identified as a <br />priority action item in San Leandro’s adopted Climate Action Plan (CAP). Cars and trucks <br />burning gasoline and diesel fuels presently create most of San Leandro’s local greenhouse gas <br />emissions (GHG), as well as other air pollutants. To reduce the pollution impacts of vehicles, the <br />CAP notes that it is incumbent upon the City to assist as many of San Leandro’s residents as <br />possible to move around without the use of fossil-fuel burning vehicles. Active transportation <br />(walking and biking) and public transportation are top priorities. For those who must use vehicles, <br />electrification of such vehicles is a key element in the City’s ongoing efforts to reduce carbon <br />Page 1 City of San Leandro Printed on 5/31/2023
The URL can be used to link to this page
Your browser does not support the video tag.