BID SUMMARY <br />BID OPENING Basset Engineering D'Arcy & Harty Constructors, Inc.Marinship Development Int.,LLC <br />DATE: Thursday, June 1, 2023 2330 Castro Street 1300 Carroll Avenue 2100 Embarcadero, Suite 205 <br />TIME: 3:00 p.m.San Francisco, CA 94131 San Francisco, CA 94124 Oakland, CA 94606 <br />LOCATION: City Clerk's Office Phone: (415) 930-2385 Phone: (415) 822-5200 Phone: (415) 716-3965 <br />Fax: N/A Fax: (415) 822-0747 Fax: N/A <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COST <br />BASE BID <br />1 Mobilization, Staging & Stockpiling per <br />Sections 7-8.4 & 9-3.4 <br />1 LS $50,000.00 $50,000.00 $136,000.00 $136,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 <br />2 Temporary Traffic Control – Level 1, <br />per Section 600 <br />44 EA $600.00 $26,400.00 $500.00 $22,000.00 $500.00 $22,000.00 $1,200.00 $52,800.00 <br />3 Temporary Traffic Control – Level 2, <br />per Section 600 <br />5 EA $800.00 $4,000.00 $600.00 $3,000.00 $1,000.00 $5,000.00 $1,600.00 $8,000.00 <br />4 Temporary Traffic Control – Level 3, <br />per Section 600 <br />6 EA $1,000.00 $6,000.00 $700.00 $4,200.00 $1,500.00 $9,000.00 $1,700.00 $10,200.00 <br />5 Pipe Cleaning & CCTV Inspection , per <br />section 500-1.1 <br />27391 LF $3.00 $82,173.00 $15.00 $410,865.00 $7.00 $191,737.00 $18.00 $493,038.00 <br />6 Trench Excavation & Backfill, 0’-5’ <br />Depth, per sections 306-3, 306-5, 306- <br />6 & 306-12 <br />54 LF $600.00 $32,400.00 $170.00 $9,180.00 $850.00 $45,900.00 $878.00 $47,412.00 <br />7 Trench Excavation & Backfill, 5’-8’ <br />Depth, per sections 306-3, 306-5, 306- <br />6 & 306-12 <br />340 LF $700.00 $238,000.00 $200.00 $68,000.00 $950.00 $323,000.00 $1,100.00 $374,000.00 <br />8 Trench Excavation & Backfill, 8’-11’ <br />Depth, per sections 306-3, 306-5, 306- <br />6 & 306-12 <br />22 LF $800.00 $17,600.00 $300.00 $6,600.00 $1,800.00 $39,600.00 $1,170.00 $25,740.00 <br />9 Point Repair, 6-inch Pipeline <br />Replacement, per section 306-7 <br />294 LF $145.00 $42,630.00 $300.00 $88,200.00 $30.00 $8,820.00 $100.00 $29,400.00 <br />10 Point Repair, 8-inch Pipeline <br />Replacement, per section 306-7 <br />72 LF $150.00 $10,800.00 $500.00 $36,000.00 $40.00 $2,880.00 $121.00 $8,712.00 <br />11 Point Repair, 10-inch Pipeline <br />Replacement, per section 306-7 <br />30 LF $160.00 $4,800.00 $700.00 $21,000.00 $100.00 $3,000.00 $127.00 $3,810.00 <br />QUANTITY <br />This document is a summary of bids received for the subject project and are provided <br />only as a convenience. Listing of a particular bid is not a finding that such bid has been <br />found to be responsive or accepted as complete by the City. An award of contract, if any, <br />is subject to approval of the City Council and/or the City Manager. Contractors should <br />refer to the contract documents for bidding information. <br />ITEM COST ITEM COST <br />PROJECT TITLE:Sanitary Sewer Point Repairs 2022 and <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2022.0120 <br />22-23.013 <br />Prepared by: Robert Magno <br />Date Approved: 5/4/2023 <br />Wicks Boulevard Vault Cover Replacement <br />Sanitary Sewer Point Repairs 2022_Wicks Blvd Vault Cover Replacement.xlsx Page 1 of 3 Printed 6/1/2023 @ 5:46 PM