My WebLink
|
Help
|
About
|
Sign Out
Home
10F Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230717
>
10F Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:53:56 PM
Creation date
7/18/2023 10:39:14 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/17/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.00 <br />Contractor's Price Proposal - Detail <br />San Leandro Belt Filter Press Room Renovation <br />117742.00 <br />CA-R5-GB01-123021-TSWIQC Master Contract #: <br />Work Order #: <br />Owner PO #: <br />Title: <br />Re: <br />June 21, 2023Date: <br />Proposal Value: <br />Contractor: T&S Intermodal Maintenance, Inc. DBA T&S West <br />$242,693.14 <br />(Excludes)Equip.MaterialLabor <br />Line TotalDescriptionUOMMod.ItemSect. <br />Section - 01 <br />01 22 23 00 0030 60' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform1 $4,171.57MO <br />Installation =x x 4,171.57 <br />FactorUnit PriceQuantity Total <br /> 3,084.11 1.3526 1.00 <br />lift for panel installation on roof and walls <br />01 74 19 00 0016 40 CY Dumpster (5 Ton) "Construction Debris"Includes delivery of dumpster, <br />rental cost, pick-up cost, hauling, and disposal fee. Non-hazardous material. <br />2 $1,163.21EA <br />Installation =x x 1,163.21 <br />FactorUnit PriceQuantity Total <br /> 859.98 1.3526 1.00 <br />demo building <br />$5,334.78Subtotal for Section - 01 <br />Section - 05 <br />05 12 23 00 0004 >30-65 LB/LF Beams, Girders And Columns3 $2,063.55TON <br />Installation =x x 0.00 <br />FactorUnit PriceQuantity Total <br /> 5,185.64 1.3526 0.00 <br />Demolition x x = 2,063.55 762.81 1.3526 2.00 <br />18" crane beam weighs 65 lbs/ft x 60' = 3900 lbs or 2 tons for demo per San Leandro request <br />$2,063.55Subtotal for Section - 05 <br />Section - 06 <br />06 11 16 00 0174 2" x 6" Wood Blocking To Concrete4 $5,691.74LF <br />Installation =x x 3,933.36 <br />FactorUnit PriceQuantity Total <br /> 7.27 1.3526 400.00 <br />Demolition x x = 1,758.38 3.25 1.3526 400.00 <br />Block and brace existing water and electrical lines that are strapped to existing girt frames, that need to stay <br />while we demo the building. Remove blocking/bracing and reset lines once building is placed back together. <br />$5,691.74Subtotal for Section - 06 <br />Section - 07 <br />07 18 13 00 0016 Two Component Epoxy Rust Inhibiting Primer E-53885 $5,072.79SF <br />Installation =x x 5,072.79 <br />FactorUnit PriceQuantity Total <br /> 2.93 1.3526 1,280.00 <br />320SF per beam x 3 beams = 1280 SF total <br />$5,072.79Subtotal for Section - 07 <br />Section - 08 <br />08 13 13 13 0018 3' x 7' x 1-3/4", 20 Gauge, Level 1 Standard Duty, Honeycomb Core, Hollow <br />Metal Door <br />6 $1,156.61EA <br />Installation =x x 1,070.56 <br />FactorUnit PriceQuantity Total <br /> 791.48 1.3526 1.00 <br />Demolition x x = 86.05 63.62 1.3526 1.00 <br />Page 1 of 4 <br />6/21/2023 <br />Contractor's Price Proposal - Detail
The URL can be used to link to this page
Your browser does not support the video tag.