My WebLink
|
Help
|
About
|
Sign Out
Home
10F Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230717
>
10F Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:53:56 PM
Creation date
7/18/2023 10:39:14 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/17/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:117742.00 <br />San Leandro Belt Filter Press Room Renovation <br />Section - 08 <br />08 13 13 13 0018 0099 For Baked Enamel Finish, Add7 $295.35MOD <br />Installation =x x 295.35 <br />FactorUnit PriceQuantity Total <br /> 218.36 1.3526 1.00 <br />08 33 23 11 0029 12' x 10', 24 Gauge Galvanized Steel Overhead Coiling Door, Chain Lift8 $3,442.58EA <br />Installation =x x 2,205.96 <br />FactorUnit PriceQuantity Total <br />XX 1,630.90 1.3526 1.00 <br />Demolition x x = 1,236.63X 914.26 1.3526 1.00 <br />labor only to adjust and reset, as needed, the existing overhead door with new building <br />$4,894.54Subtotal for Section - 08 <br />Section - 09 <br />09 01 90 52 0025 Exterior Coating Blistered Pitted, Rust, Commercial Blast, Metal Surfaces, <br />Surface Preparation <br />9 $3,324.15SF <br />Installation =x x 3,324.15 <br />FactorUnit PriceQuantity Total <br /> 1.92 1.3526 1,280.00 <br />clean rust on existing red iron prior to painting with rust inhibitor primer and coat of paint. 320SF per beam x 3 <br />beams = 1280 SF total <br />09 91 13 00 0330 2 Coats Paint, Brush/Roller Work, Paint Metal Beams And Bar Joists10 $3,012.51SF <br />Installation =x x 3,012.51 <br />FactorUnit PriceQuantity Total <br /> 1.74 1.3526 1,280.00 <br />paint beams after applying rust inhibitor <br />$6,336.66Subtotal for Section - 09 <br />Section - 13 <br />13 00 00 00 0001 Butler Building Shell & Framing Material Only11 $136,108.49LS <br />Installation =x x 136,108.49 <br />FactorUnit PriceQuantity TotalNPP 100,627.30 1.3526 1.00 <br />13 34 19 00 0042 20' Eave Height, Up To 30' Long, >40' To 50' Wide Clear Span Tapered Beam <br />Frame Building With 26 Gauge Roofing And Siding <br />12 $57,190.63GSF <br />Installation =x x 39,709.63 <br />FactorUnit PriceQuantity Total <br />X 16.31 1.3526 1,800.00 <br />Demolition x x = 17,481.00X 7.18 1.3526 1,800.00 <br />2400 SF Butler Building, labor only. <br />Red iron is being reused, so we are providing a 25 % reduction in quantity, in order to offset the labor <br />difference <br />13 34 19 00 0111 Single Door, Metal Frame Rough Opening13 $855.60EA <br />Installation =x x 694.60 <br />FactorUnit PriceQuantity Total <br /> 513.53 1.3526 1.00 <br />Demolition x x = 161.00 119.03 1.3526 1.00 <br />single door <br />13 34 19 00 0114 12' x 12' Overhead Door, Metal Frame Rough Opening14 $1,590.75EA <br />Installation =x x 1,389.51 <br />FactorUnit PriceQuantity Total <br /> 1,027.29 1.3526 1.00 <br />Demolition x x = 201.24 148.78 1.3526 1.00 <br />13 34 19 00 0117 >12 To 18 SF, Window Opening, Metal Frame Rough Opening15 $930.05EA <br />Installation =x x 747.07 <br />FactorUnit PriceQuantity Total <br /> 552.32 1.3526 1.00 <br />Demolition x x = 182.98 135.28 1.3526 1.00 <br />5x5 opening for belt line <br />Page 2 of 4 <br />6/21/2023 <br />Contractor's Price Proposal - Detail
The URL can be used to link to this page
Your browser does not support the video tag.