My WebLink
|
Help
|
About
|
Sign Out
Home
10I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230717
>
10I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:53:56 PM
Creation date
7/18/2023 10:40:04 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/17/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: July 17, 2023 <br />Agenda Number: 10.i. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 23-332 <br />File Type: Staff Report <br />Adopt a Resolution Appropriating Funding for Washington Manor Park Pool Renovation, Project No. <br />2023.3400 (provides funding for annual maintenance and repairs to the Family Aquatic Center pool, <br />deck, and play equipment) <br />COUNCIL PRIORITY <br />·Infrastructure <br />SUMMARY <br />This action will provide funding for ongoing annual maintenance and renovation of existing <br />facilities. <br /> RECOMMENDATIONS <br />Staff recommends appropriation of funds for maintenance and renovation of the Washington <br />Manor Park Pool (Family Aquatic Center). <br />BACKGROUND <br />The Family Aquatic Center opened to the public in 2006. The pool is overdue for resurfacing, the <br />play structure in the pool is at the end of its life, the water slide and tower are due for renovation, <br />the original splash pad no longer functions, and the pool deck has been etched by chlorine from <br />the pool water and needs to be replaced. <br />Additionally, the Public Works Department reports that ongoing maintenance of the facility costs <br />$350,000/year on average. <br />In the summer of 2022, the facility was closed due to the rough condition of the pool surfacing, <br />and it remains closed for the 2023 season. Prior to closure this facility was popular and often had <br />a line of patrons waiting to enter. <br />In May 2023, $1,000,000 of funding was appropriated for a renovation project though a mid-year <br />budget adjustment. $5,200,000 is currently appropriated for construction of a new competition <br />pool at the site; however, the total project cost is estimated at $10,000,000 and the work is on <br />hold. <br />Analysis <br />Page 1 City of San Leandro Printed on 7/12/2023
The URL can be used to link to this page
Your browser does not support the video tag.