My WebLink
|
Help
|
About
|
Sign Out
Home
10J Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20230717
>
10J Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:53:56 PM
Creation date
7/18/2023 10:40:06 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/17/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 23-330 <br />Committee Review and Actions <br />·On July 5, 2023, Engineering and Transportation (E/T) Department staff presented an update <br />on the stability of Lake Chabot Road and an emergency repair scheme for the storm <br />damaged upslope embankment at the City Council Facilities and Transportation Committee <br />meeting. The presentation included the need to repair the upslope erosion as an emergency <br />before the next winter storms and the request of additional appropriation to fund the <br />emergency repair and the design of a repair for the downslope erosion. The committee <br />expressed support of both the emergency repair and design effort for the downslope erosion <br />repair. <br />·On February 7, 2023, Engineering and Transportation (E/T) Department staff presented a <br />summary of storm damage to the hillsides above and below Lake Chabot Road at the City <br />Council Facilities and Transportation Committee meeting. The presentation included repair <br />schemes and possible options for short- and long-term measures to reopen the road to <br />vehicular traffic, and/or to pedestrian & bicycle use only. <br />Applicable General Plan Policies <br />·GOAL T-5 Streets & Highways <br />·Policy T5.3 Maintenance. Regularly maintain City streets and traffic control devices to <br />ensure that streets operate safely and efficiently. <br />·GOAL EH-1 Reduce the potential for injury, property damage, and loss of life resulting from <br />earthquakes, landslides, floods, and other natural disasters <br />o Policy EH-1.3 Off-Site Impacts of Hillside Development. Ensure that development within <br />landslide-prone or geologically hazardous areas does not contribute to higher hazard levels <br />on adjacent or nearby properties. <br />Financial Impacts <br />Current project funding is shown below. <br />·Capital Improvement Fund, Account 190-38-834 $ 1,000,000 <br />·Funds appropriated by this Action, Acc. 210-38-834 $ 450,000 <br />Total $ 1,450,000 <br />This CIP will require additional Council appropriation of $450,000 for Fiscal Year 2023-2024, <br />which will be a reallocation from Fiscal Year 2022-2023 citywide salary savings. Any future <br />reimbursement from FEMA will be assigned to the General Fund Undesignated Fund Balance. <br />The estimated Upslope project cost is shown below: <br />·Construction Contract $ 1,015,000 <br />·Construction Contingencies $ 92,000 <br />·Design Phase $ 98,000 <br />Page 3 City of San Leandro Printed on 7/12/2023
The URL can be used to link to this page
Your browser does not support the video tag.