File Number: 23-330 <br />·Construction Administration $ 45,000 <br />Sub Total $ 1,250,000 <br />The estimated downslope design cost is $ 200,000 <br />Total Cost $ 1,450,000 <br />This Council action was not budgeted and will require an appropriation of $450,000 for this <br />project. The source of these funds will be Fiscal Year 2022-2023 citywide salary savings . <br />ATTACHMENT <br />Attachment A: Accelerated Award Resolution <br />PREPARED BY: John O’Driscoll, Associate Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 7/12/2023