My WebLink
|
Help
|
About
|
Sign Out
Home
RRM Design Group CSA 20230717
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
RRM Design Group CSA 20230717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 9:21:58 AM
Creation date
8/3/2023 9:21:50 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/17/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 1 of 3 <br />EXHIBIT A <br />SCOPE OF SERVICES <br /> <br />This contract is for consulting services to provide Construction Administration. The following scope of <br />services is based on a twelve-month construction duration for Memorial Park Improvements Project for the <br />services requested of RRM Design Group (CONSULTANT) and subconsultant, including electrical <br />engineering services. <br /> <br />SCOPE OF SERVICES <br /> <br />Task 1: Pre-Construction Meeting and Conformed Drawings <br />CONSULTANT’s Project Manager shall attend one pre-construction meeting onsite with the City and <br />selected contractor. In preparation for this meeting, CONSULTANT shall prepare and coordinate the <br />production of conformed drawings and specifications. <br /> <br />Deliverables: <br />• Conformed drawings and specifications <br />• Pre-construction meeting agenda and minutes <br /> <br />Task 2: Construction Administration <br />CONSULTANT shall support the City during the construction phase of the project. The duration of the <br />project is assumed to be twelve months. Consultant shall review and respond to requests for information <br />(RFI), change orders (CO), submittals, and contractor supplied shop drawings. Under this task, <br />CONSULTANT shall also prepare and issue supplemental instructions as necessary to clarify technical <br />details. <br /> <br />Due to the unknown nature of the level of effort that will be required for this task, it is assumed that this task <br />will take up to 250 hours of consultant’s time. <br /> <br />Deliverables: <br />• Response to RFI, CO, submittals, shop drawings and supplemental instructions within 10 working days of <br />receipt. <br /> <br />Task 3: Construction Meetings and Observation <br />CONSULTANT’s project manager and/or designated representative will prepare for and attend up to 40 <br />construction meetings at the park site. It is anticipated that in addition to consultant’s project manager <br />attending the meetings, consultant’s civil engineer will attend up to six site meetings, and electrical <br />engineer will attend up to two site meetings. <br /> <br /> <br /> <br />The purpose of these meetings is to generally coordinate with the City and contractor and to address <br />issues that are topical. While in attendance at these construction meetings, CONSULTANT shall conduct <br />field observations. The field construction observation is not intended to be an exhaustive check or a <br />detailed inspection of the contractor’s work but is rather to allow CONSULTANT to become generally <br />DocuSign Envelope ID: FF103B49-503A-42C8-8688-99EB27865247
The URL can be used to link to this page
Your browser does not support the video tag.