My WebLink
|
Help
|
About
|
Sign Out
Home
RRM Design Group CSA 20230717
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
RRM Design Group CSA 20230717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 9:21:58 AM
Creation date
8/3/2023 9:21:50 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/17/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 2 of 3 <br />familiar with the work in progress and to determine, in general, if the work is proceeding in accordance with <br />the contract documents. CONSULTANT shall not supervise, direct, or have control over the contractor’s <br />work nor have any responsibility for the construction means, methods, techniques, sequences, or <br />procedures selected by the contractor, nor for the contractor’s safety precautions or programs in connection <br />with the work. These rights and responsibilities are solely those of the contractor in accordance with the <br />contract documents. <br /> <br />CONSULTANT shall not be responsible for any acts or omissions of the contractor, subcontractor, any <br />entity performing any portion of the work, or any agents or employees of any of them. CONSULTANT shall <br />not be responsible for the contractor’s failure to perform work in accordance with the contract documents or <br />any applicable laws, codes, rules, or regulations. <br /> <br />Deliverables: <br /> <br />• Meeting minutes and site observation notes related to design technical aspects only. <br /> <br />Task 4: Project Close-Out <br />The CONSULTANT shall attend two punch list item walks with the contractor and the City - preliminary and <br />final; and prepare a memorandum of punch list items for the contractor to address. Consultant shall also <br />conduct any other close-out activities that are required for project completion.. <br /> <br />Deliverables: <br />• Two (2) punch list memorandum <br />• Close-out activities required for project completion <br /> Task 5: Record Drawings <br />Upon completion of construction work, CONSULTANT shall compile an electronic (pdf format) reproducible <br />set of record drawings based on contractor’s mark-up, record drawings, addenda, change orders, and other <br />data furnished by the contractor. <br /> <br />Deliverables: <br />• One (1) set of electronic reproducible revised compiled set of drawings in pdf format. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: FF103B49-503A-42C8-8688-99EB27865247
The URL can be used to link to this page
Your browser does not support the video tag.