My WebLink
|
Help
|
About
|
Sign Out
Home
T & S Intermodal Maintenance NPSA 20230801
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
T & S Intermodal Maintenance NPSA 20230801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:32:00 PM
Creation date
8/8/2023 1:31:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
8/1/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />T & S West <br />P O Box 1592 Linden, CA 95236 Office: (209) 942-1360 Fax: (209) 942-1368 <br />U <br />Scope of Work <br /> <br />Project Description: City of San Leandro <br />Metal Building- Rehabilitation <br />Date: June 5, 2023 <br />Contractor: T & S West <br /> <br />T & S West (T & S) is pleased to submit a Detailed Scope of Work for the above referenced project. <br />Scope based per job walk with Hayes Morehouse on 05/10/23. <br /> <br />Inclusions: <br />1. Demolition/Clean <br />a. Remove all metal panels, z purlins, girts, and roof. <br />b. Remove and dispose of crane and attached I-Beam from facility. <br />c. Pressure wash all existing red iron steel (I beams). <br />d. Block and brace existing conduit, piping, etc. during demolition work. <br /> <br />2. Installation <br />a. New galvanized z purlins and girts throughout building. <br />b. New metal panels on 3ea sides of building. <br />c. New metal building skylight panels on roof- 4ea. <br />d. Add ridge vents on roof, in lieu of old ventilation. <br />e. Add gutter to front and back of building. <br />f. Place rust inhibitor in red iron I-Beams, and paint after rust inhibitor coat. <br />g. Add 2ea wall vents to back western wall of facility, approx. 2’x3’ each. <br />h. Replace electrical conduit, as needed and install 4ea new lights <br />Clarifications: <br /> <br />1. Metal building price is valid through June 29, 2023. Any increases in pricing shall be <br />compensated by a supplemental change order to compensate for the price increase. <br />2. Keep existing red iron steel, concrete foundation, and tie rods. <br />3. Painting of the new metal building is excluded. All new metal shall be galvanized and/or enamel <br />coated from factory. <br />4. This proposal is based on performing all work in one move in for all operations, during normal <br />working hours 7am-4pm, Monday through Friday, unless otherwise stated above. We would be <br />happy to discuss alternatives for scheduling, if other requests are needed. <br />5. Owner to provide staging area directly adjacent for work. <br />DocuSign Envelope ID: 7F7BA4FE-A377-4495-B797-3B8499FD1E12
The URL can be used to link to this page
Your browser does not support the video tag.