Laserfiche WebLink
2315 South Bascom Ave, 200 Campbell, CA 95008 <br />408.377.3099 f 408.377.2189 B-796683 <br />1 <br />May 26, 2023 <br />Larry Lazzarinni <br />14645 Highway 9 <br />Boulder Creek, CA 95006 <br />650.279.4120 <br />New Butler Building Secondary Framing and Accessories <br />Dear Mr. Collins <br />AM Star Construction, Inc. is pleased to submit this estimate to proceed with the Detailing <br />and components for your existing BUTLER® Building as per the plans and specifications <br />generated by our office and incorporated with AM Star General Terms and Conditions, <br />Home Improvement Contract Specifications, AM Star Estimating Notes, Metal Building <br />Manufacturer’s Association Common Industry Practices (most recent edition), BUTLER® <br />standard terms and conditions, BUTLER® Unit Price Report, estimating notes, and <br />proposal exhibits. This proposal will take precedence over any bid plans or specifications <br />provided and shall be incorporated into any purchase order or agreement signed. <br />BUTLER® Components must be released for fabrication within two weeks from <br />engineering completion to avoid any material price escalations. It is further understood and <br />agreed that in the event material, equipment, labor, or subcontract prices escalate past what <br />was used to make this estimate an equitable adjustment shall be made. This is a production <br />order and will not be clarified or put on production hold. The following complete scope of <br />work is included: <br />Construction Management, Engineering, Planning and Permits: T and M if Required <br />Butler Detailing as per Unit Summary $29,983.75 <br />Butler Component Fabrication $69,962.09 <br />Certified Butler Erection By Others <br />$99,945.85 <br />Project Notes: Detail Scheduling: to be determined at time of order entry. <br />All Permits, City Fees, Additional Freight, Special Inspections and Sales Tax are not included. <br />This estimate is valid for 10 days from the date of quotation and must be accepted by End Customer. <br />Price based on clear, compacted, flat site access to and 25’ around slab drivable with 2 wheel fork lift with <br />perimeter ramp, Dumpster provided by Owner, No Grading work included past +/- .1 ft or repair/cleaning of <br />landscaping or hardscape included. This quote does not include any field welding or field painting or touch up <br />per MBMA 4.2.4. Shop primer included is for transport only. Anchor bolts and correction of are not part of <br />this proposal and shall be verified by Owner prior to mobilization. Anchor Bolts part of foundation cost not <br />provided by Building Manufacturer. The unloading and storage of Building Materials shall be additional to <br />DocuSign Envelope ID: 7F7BA4FE-A377-4495-B797-3B8499FD1E12