My WebLink
|
Help
|
About
|
Sign Out
Home
WRT, LLC CSA 20230710
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
WRT, LLC CSA 20230710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 10:04:27 AM
Creation date
8/10/2023 10:04:13 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/10/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and 07/10/2023 <br />WRT, LLC for the Comprehensive Parks Master Plan Exhibit A – Page 10 of 16 <br />WRT will present the findings of the Gap Analysis/Needs Assessment to the Advisory <br />Committee. <br />Meetings: <br />• Advisory Committee meeting <br /> <br />Deliverables: <br />• Gap Analysis and Needs Assessment Memo <br /> <br />TASK 5: Washington Manor Park Site-Specific Master Plan <br />The inventory and assessment, community priorities, and gap analysis/needs assessment will <br />provide a foundation for both the Comprehensive Parks Master Plan, and a site- specific Master <br />Plan for Washington Manor Park. The Washington Manor Park planning effort will include the <br />following components: <br />5.1 Review of Gap Analysis and Needs Assessment Findings <br />WRT will revisit and analyze findings from the gap analysis and needs assessment and other <br />foundational work to address and provide specific recommendations as they relate to <br />Washington Manor Park. <br />5.2 Washington Manor Park Site Analysis <br />WRT will leverage the park inventory and assessment work completed in Task 2 and conduct <br />more detailed site analysis of the Washington Manor site. We understand that this assessment <br />will draw on existing assessment of buildings and structures, and do not anticipate including <br />architectural expertise on the team. However, we anticipate that civil engineering review will add <br />value, and include CSW/ST2 on the team for this purpose. <br /> <br />5.3 Washington Manor Park Public Workshop (1) <br />WRT will conduct one public engagement event focused specifically on Washington Manor <br />Park. The goal of the event will be to solicit feedback and comments from community <br />members, residents, and visitors to the park. WRT can present relevant background to create <br />a framework for community members to envision and communicate ideas for change. <br />5.4 Conceptual Site Plan <br />Building on the analysis of community needs, physical characteristics of the park, and <br />feedback from the community, WRT will prepare a . concept-level site plan <br />showing the general location of proposed park elements, facilities, and proposed <br />improvements. The site master plan will be accompanied by a summary of program elements <br />and rough order-of-magnitude capital cost estimates for improvements. <br />5.5 Advisory Committee Meeting #5 <br />DocuSign Envelope ID: 21BF0908-C9FD-48C7-B37A-409982981147
The URL can be used to link to this page
Your browser does not support the video tag.