My WebLink
|
Help
|
About
|
Sign Out
Home
Brightview Landscape Services Inc NPSA City Facilities Landscape 20230918
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Brightview Landscape Services Inc NPSA City Facilities Landscape 20230918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 2:47:55 PM
Creation date
11/13/2023 2:47:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/18/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3 <br />PERFORMANCE STANDARDS <br />101.7 Contract Start Up <br />(a)During the first three (3) months of the contract, the Contractor will inspect the sites <br />at least twice per month and will review and discuss inspection results with the <br />Director, or designee. This process and timeline will allow for the Contractor to <br />fully understand the site issues, existing conditions, areas that are substandard, and <br />allow for time to be able to successfully and consistently implement the <br />specifications and scope of work. <br />(b)To acknowledge a ‘ramp up’ period during the first three (3) months, the <br />Contractor’s work will be deemed as meeting standards unless there is obvious and <br />measurable neglect on the part of the Contractor. The City acknowledges that some <br />areas may have been turned over to the Contractor in an as-is condition and not <br />meeting standards. Contractor will be expected to maintain the areas at a level that <br />prevents further deterioration. <br />(c)At the end of the first three (3) months, Contractor will submit an inspection <br />summary to the City by the 10th of the fourth month as to each site’s compliance <br />with the standards and specifications. The Director, or designee and the Contractor <br />will agree upon a reasonable action plan with deadlines to bring any specific areas <br />up to satisfactory levels. <br />101.8 Communication of Performance Issues <br />(a)After the start-up period, the Director, or designee will utilize an “Evaluation <br />Checklist” during scheduled, as well as random, inspections, to evaluate provision <br />of services and communicate whether Contractor’s performance is meeting <br />standards or below standards. The Director, or designee may also utilize email, the <br />City’s workorder software or phone calls to relay information on below standard <br />work and request a deadline for completion. <br />(b)The Director, or designee will also coordinate, upon request from the Contractor, <br />onsite review of any areas that are below standard in order to communicate and <br />clarify the specifications and scope of work. In addition, regular meetings with the <br />Director, or designee may also be scheduled to evaluate the provision of services <br />and contract implementation. <br />(c)It is important that the Director, or designee receive timely and correct updates to <br />the punch list of items that have been identified as below standards and that the <br />Contractor is working on bringing back to meeting standards and specifications. <br />The updates should be in the written format presented, either a response via a <br />customer relationship management, or a written update on a punch list format. If <br />Exhibit A <br />Page 11 of 55 <br />DocuSign Envelope ID: FBE0D324-5B4D-413D-B3D7-9F9F4584939A
The URL can be used to link to this page
Your browser does not support the video tag.