My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231106
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:56:36 PM
Creation date
12/15/2023 1:16:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/6/2023
Retention
PERM
Document Relationships
Reso 23-146 CSA Schaaf and Wheeler for design of Stormwater Trash Capture Devices
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
Schaaf & Wheeler CSA 20231106
(Amended)
Path:
\City Clerk\City Council\Agreements\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and 6 November 2023 <br />Schaaf and Wheeler for Trash Load Reduction Planning Exhibit B – Page 1 of 2 <br />The following is a summary of the ‘Compensation Schedule’ to be included in the Contract Services <br />Agreement with Schaaf and Wheeler for the design of Storm Water Trash Capture Devices, Project No. <br />2017.0540 <br /> <br />COMPENSATION SCHEDULE & REIMBURSABLE EXPENSES <br /> <br /> <br />Consultant will be paid on a time and materials not to exceed basis per the following schedule: <br /> <br />Phase 1 – Preliminary Design <br />Task 1.1 Project Management and Meetings $11,621 <br />Task 1.2 Data Collection and Research $62,203 <br />Task 1.3 Hydraulic Analysis $23,690 <br />Task 1.4 Cost Estimate $5,850 <br />Task 1.5 Basis of Design Report $11,120 <br />Task 1.6 Conceptual Designs $33,500 <br /> Total Preliminary Design: $147,984 <br /> <br />Phase 2 – Construction Bid Documents <br />Task 2.1 Project Management and Meetings $35,378 <br />Task 2.2 Design Development and Field Research $217,683 <br />Task 2.3 Permit Applications $41,960 <br />Task 2.4 30% PSE Submittal $96,980 <br />Task 2.5 70% PSE Submittal $49,040 <br />Task 2.6 100% PSE $55,607 <br />Task 2.7 Bid Set PSE $24,520 <br />Task 2.8 Bid Support $5,760 <br /> Total Construction Bid Documents: $527,016 <br /> <br /> Total Contract: $675,000 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.