Laserfiche WebLink
BID SUMMARYBID OPENINGDATE: September 20, 2023Date Approved: 9/14/2023TIME: 3:00 p.m.LOCATION: City Clerk's OfficeITEMNO.ITEM UNIT COST ITEM COSTENGINEER'S ESTIMATEPROJECT TITLE:PROJECT NO.:BID NO.:QUANTITYAnnual Sidewalk Repair Program 23-242023.006023-24.005Prepared by: D. Garcia24 Relocate Roadside Sign on New Post per drawing 136 case 31013 EA $716.63 $2,149.8825 Install New Roadside Sign on New Post per drawing 136 case 31014 EA $799.31 $3,197.2526 Excavation resurfacing per drawing 122A, B, C case 3101: 6” thickness405 SF $30.32 $12,279.0927 Excavation resurfacing per drawing 122A, B, C case 3101: 9” thickness10 SF $35.83 $358.3128 Excavation resurfacing per drawing 122A, B, C case 3101: 12” thickness10 SF $41.34 $413.4429e removal remobilization due to nes1 EA$441.00$441.0030 Valley Gutter per Drawing 114 case 3101205 SF$44.10 $9,040.5031 Red Curb Paint60 LF$5.31$318.60TOTAL BASE BID:REQUIRED DOCUMENTATION:Agreement to be BoundSUBCONTRACTORS:$564,890.34Bid BondSan Leandro Local BusinessAddendum #1-225 % ParticipationGood Faith EffortKerex Engineering, Inc.4941 Pacheco Blvd.Martinez, CA 94553Phone: (925) 387-8913Fax: (925) 387-0853UNIT COST ITEM COST$500.00 $1,500.00$500.00 $2,000.00$30.00 $12,150.00$1,000.00 $10,000.00$1,000.00 $10,000.00$5,000.00 $5,000.00$50.00 $10,250.00$10.00 $600.00Reliable Tree Experts$740,545.00YESYESAnnual Sidewalk Repair Program 23-24Page 7 of 8Printed 9/22/2023 @ 11:55 AMNONOSUBMITTEDN/A