My WebLink
|
Help
|
About
|
Sign Out
Home
ConvergeOne, Inc. CSA 20231204
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
ConvergeOne, Inc. CSA 20231204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 1:25:26 PM
Creation date
12/26/2023 2:38:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/4/2023
Retention
PERM
Document Relationships
5G Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231204
Reso 23-173 2023 Resolution CSA ConvergeOne
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />9. MILESTONE AND/OR PROJECT ACCEPTANCE <br />Upon completion of the services described in this SOW, ConvergeOne shall provide the Customer with <br />an Acceptance Form. Upon delivery of the Acceptance Form, the Customer has 5 working days to <br />review and accept. Failure to respond within the designated 5 day period, signifies the completion of <br />the milestone or project. To refuse acceptance, the Customer must both indicate non-acceptance with <br />written notification to ConvergeOne within the 5 day period noted above and describe why it was not <br />accepted. ConvergeOne shall have up to 10 days after the receipt of such notice to correct the error <br />given it is within ConvergeOne scope and control to do so. The period to correct the error may be <br />extended by mutual consent. <br />10. CUSTOMER RESPONSIBILITIES <br />10.1.Provide a single point of contact that will be responsible for: <br />x Understanding the business process impact and technical requirements and who has the <br />authority to make binding decisions on the Customers behalf. <br />x Working with ConvergeOne Project Manager to develop mutually agreed project <br />schedule, including outside of Normal Business Hours test and cutover windows (if <br />applicable). <br />x Ensuring all Customer responsibilities are completed in accordance with the project <br />schedule. <br />x Reasonable notification of schedule and changes for the installation work. <br />x Attending all project status meetings. <br />10.2.Site Preparation: <br />x Ensure the equipment room is ready, including all electrical, wiring, grounding, lighting, <br />racks, and HVAC required to maintain equipment within operating conditions specified by <br />the equipment manufacturer. <br />x Provide required cable/patch panels that meet all requirements for Category 5e, racks, and <br />network connectivity. <br />x Accept receipt of equipment and store it in a secure area. Retain shipping documentation, <br />and inventory shipments by box count, and report any apparent external damage to the <br />ConvergeOne Project Manager. <br />x Provide floor plans for equipment room configuration and related locations if applicable. <br />x Ensure that the existing Customer network is configured, connected, and operating within <br />the manufacturer's specifications. <br />DocuSign Envelope ID: F142FC13-2565-4871-97AE-5ACD1BA331FC
The URL can be used to link to this page
Your browser does not support the video tag.