My WebLink
|
Help
|
About
|
Sign Out
Home
5F Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231016
>
5F Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:56:02 PM
Creation date
12/26/2023 3:00:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/16/2023
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Price - Contractor to insert pricing here - Shown in $ or portions of a $ <br />Weed Abatement PRICING <br />Citywide Medians *- Hardscape Not Adjacent to <br />Landscape Areas or within the same continuous median <br />perimeter. See Weed Abatement Areas Tab Per Linear Foot 0.01$ <br />Citywide Curb & Gutter* - Hardscape, No Landscaping - <br />Back of Sidewalk to Back of Sidewalk Per Linear Foot 0.01$ <br />Mowing or Equipment Trimming* - Weed areas. See <br />Weed Abatement Areas Tab Per Square Foot 0.04$ <br />Spraying Weeds in identified areas* - no landscaping, no <br />irrigation; See Weed Abatement Areas Tab Per Square Foot 0.01$ <br />*Fee paid by City will be inclusive of all treatments need to <br />remove the weeds, not a per application fee. <br />Deductives <br />Landscape Areas no longer requiring any form of <br />maintenance or irrigation maintenance - to be removed <br />from contract areas Per Square Foot 8.54$ <br />Labor Rates; inclusive of all wages, benefits, taxes <br />General Laborer (Basic Labor Tasks/Repairs)Hour 56.40$ <br />Irrigation Technician (General Irrigation Repairs)Hour 120.00$ <br />Irrigation Specialist (Technical Irrigation Repairs)Hour 120.00$ <br />Minimum Service Call Charge Per Call 240.00$ <br />Markup on material cost <br />Percentage above <br />cost 72.42$ <br />Markup on subcontractor cost (if necessary) <br />Percentage above <br />cost 47.06$ <br />Other Services <br />Aeration - Turf Per Square Foot 0.00$ <br />Fertilization - Turf Per Square Foot 0.00$ <br />Fertilization - Landscape Areas Per Square Foot 0.00$ <br />Dethatching - Turf Per Square Foot 0.01$ <br />Overseeding/Top Dressing - Turf Per Square Foot 0.03$ <br />Plant Replacement * See PLANT MATERIAL xxx <br />PLANT MATERIAL <br />One Gallon (including labor and materials installed Each 11.41$ <br />Five Gallon (including labor and materials installed)Each 41.87$ <br />Fifteen Gallon (including labor and materials installed; for <br />trees-install city provided stake/strap)Each 154.79$ <br />Attachment C - Compensation <br />Extra Services
The URL can be used to link to this page
Your browser does not support the video tag.