Laserfiche WebLink
City of San Leandro <br />14143-14273 Washington Avenue Warehouse Project <br /> <br />36 <br />and from the project site). Table 9 summarizes the project’s maximum annual operational emissions <br />by emission source and maximum daily operational emissions. <br />Table 9 Estimated Operational Emissions <br /> Emissions <br />Emissions Source ROG NOx PM10 PM2.5 <br />Annual Emissions (tons/year) <br />Area 0.27 <0.01 <0.01 <0.01 <br />Energy <0.01 0.02 <0.01 <0.01 <br />Mobile <0.01 <0.01 <0.01 <0.01 <br />Total Emissions 0.27 0.02 <0.01 <0.01 <br />Significance Threshold 10 10 15 10 <br />Threshold Exceeded? No No No No <br />Daily Emissions (pounds/day) <br />Average Daily Emissions 1.49 0.13 0.02 0.01 <br />Significance Threshold (pounds/day) 54 54 82 54 <br />Threshold Exceeded? No No No No <br />ROG = reactive organic gases, NOX = nitrogen oxides, PM10 = particulate matter 10 microns in diameter or less, PM2.5 = particulate <br />matter 2.5 microns or less in diameter; lbs/day = pounds per day, BAAQMD = Bay Area Air Quality Management District <br />Note: The updated emissions modeling was completed using CalEEMod in accordance with applicant-provided information and data. <br />Some numbers may not add up due to rounding. Emissions presented are the highest of the winter and summer modeled emissions. <br />See the end of Appendix B for updated model output results. <br />As shown in Table 9, operational emissions would not exceed BAAQMD regional thresholds for <br />criteria pollutants. Therefore, project operation would not result in a cumulatively considerable net <br />increase of a criteria pollutant for which the project region is in non-attainment, and impacts would <br />be less than significant. <br />Mitigation Measure <br />AQ-1 BAAQMD Best Management Practices for Construction-Related Fugitive <br />Dust Emissions <br />The project applicant shall require all construction contractors to implement the basic construction <br />mitigation measures recommended by BAAQMD to reduce fugitive dust emissions. Emission <br />reduction measures will include, at a minimum, the following measures: <br />1. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved <br />access roads) shall be watered two times per day. <br />2. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. <br />3. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power <br />vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. <br />4. All vehicle speeds on unpaved roads shall be limited to 15 mph. <br />5. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. <br />Building pads shall be laid as soon as possible after grading unless seeding or soil binders are <br />used.