My WebLink
|
Help
|
About
|
Sign Out
Home
5F Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2023
>
Packet 20231120
>
5F Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 5:57:18 PM
Creation date
12/26/2023 3:19:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/20/2023
Retention
PERM
Document Relationships
Reso 23-160 CSA BKF - Amendment
(Amended)
Path:
\City Clerk\City Council\Resolutions\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: November 20, 2023 <br />Agenda Number: 5.f. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 23-538 <br />File Type: Staff Report <br />Adopt a Resolution of the City of San Leandro City Council to Approve and Authorize the City <br />Manager to Execute an Amendment to a Consulting Services Agreement with BKF Engineers, Inc. <br />for Design of the Shoreline Park Project 2020.3080 for $78,990 <br />COUNCIL PRIORITY <br />·Infrastructure <br />SUMMARY <br />Amends an existing agreement with BKF Engineers, Inc. (BKF) to include additional work <br />related to cost estimating, permitting, and demolition. <br /> RECOMMENDATIONS <br />Staff recommends authorizing an amendment to the existing agreement with BKF. <br />BACKGROUND <br />The City has an existing agreement with BKF for conceptual design of Shoreline Park, a new <br />park located on the jetties surrounding the former San Leandro Marina. The City Manager is <br />authorized to approve amendments to the existing agreement up to a cumulative total of <br />$59,718. One amendment has already been approved for $12,210, the amendment <br />discussed herein will bring the cumulative total to $78,990. <br />The amendment will allow BKF to address the following three issues: <br />1.Additional cost estimates are required to accurately calculate and track the share of the <br />work assigned to Cal Coast Companies; the Developer of the land adjacent to the new <br />park. <br />2.The project requires approval from the Bay Conservation and Development <br />Commission (BCDC). Correspondence with BCDC during design revealed that BCDC <br />approval would not be granted unless expert testimony in Shoreline Engineering and <br />Environmental Science and Biology was provided. <br />3.The San Leandro Marina ceased operations in January 2023. The area is closed to the <br />public and posted with no trespassing signs; however, the unused facilities at the <br />Marina are an attractive nuisance and vandalism has become a problem. <br />Analysis <br />The current agreement with BKF includes cost estimating, so it is efficient and economical to <br />add the additional cost estimates to the existing scope of work. <br />The agreement also includes work required to obtain approval from BCDC; however, hiring <br />Page 1 City of San Leandro Printed on 12/21/2023
The URL can be used to link to this page
Your browser does not support the video tag.