My WebLink
|
Help
|
About
|
Sign Out
Home
Bandwidth Lease Agreement 20231024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Bandwidth Lease Agreement 20231024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:06:02 PM
Creation date
12/27/2023 4:05:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/24/2023
Retention
PERM
Document Relationships
5D Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2023\Packet 20231120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - MITIGATION MONITORING PROGRAM <br />June 2023 C-16 SF Bay Fiber Optic Cables Project <br /> <br /> <br /> <br />1 1.4.4 CULTURAL RESOURCES - TRIBAL <br /> <br />2 <br />3 <br /> <br />4 MM CUL-1/TCR-1: Discovery of Previously Unknown Cultural or Tribal Cultural <br />5 Resources (see Cultural Resources) <br />6 MM CUL-2/TCR-2: Unanticipated Discovery of Human Remains (see Cultural <br />7 Resources) <br />8 MM CUL-3/TCR-3: Cultural and Tribal Resources Awareness Training (see Cultural <br />9 Resources) <br /> <br />10 1.4.5 GREENHOUSE GAS EMISSIONS <br /> <br />11 <br />12 <br /> <br />13 MM AIR-1: Use of Tier 4 Equipment (see Air Quality) <br />14 MM AIR-2: Standard Control Measures for Construction Equipment (see Air <br />15 Quality) <br /> <br />16 1.4.6 HAZARDS AND HAZARDOUS MATERIALS <br /> <br />17 <br />18 <br /> <br />19 MM HAZ-1: Develop and Implement Spill Contingency and Hazardous Materials <br />20 Management Plans. At least 30 days before start of construction of the Project, <br />21 Bandwidth shall submit the following plans for review and approval by CSLC <br />22 staff: <br /> <br />23 Worker Health and Safety Plan <br /> <br />24 A final Worker Health and Safety Plan (WHSP) that has been reviewed and <br />25 approved by the San Mateo County Divisions of Environmental Health shall <br />26 address measures to minimize risks from landfill gases and potential worker <br />27 exposure to hazardous materials associated with construction activities at the <br />28 western cable landing sites and within 1,000 feet of the former Brisbane Landfill. <br />29 The WHSP shall be prepared by a qualified geologist or engineer. <br />Potential Impact: Hazards and hazardous materials – Impacts from accidental <br />release of hazardous materials <br />Applicable mitigation measures for potential impacts of greenhouse gas <br />emissions <br />Applicable mitigation measures for potential impacts on cultural resources - <br />tribal <br />DocuSign Envelope ID: 8D8CF2E2-DF6D-4A11-B610-2B1544DD7C30
The URL can be used to link to this page
Your browser does not support the video tag.