My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240102
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 10:56:51 AM
Creation date
2/23/2024 3:26:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/2/2024
Retention
PERM
Document Relationships
Reso 2024-002 CLIMATEC PHASE III PROJECT
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Installation Agreement – Att A <br />Page 14 of 17 <br /> <br />• Start-up/testing of the new units. <br />The Scope of Work excludes: <br />• Undisclosed electrical and structural upgrades/modifications. <br />• Roofing other than repairs required for new roof curb adapters. <br />• Unforeseen repairs to existing equipment such as, but not limited to, water leaks, piping, <br />valves/actuators, and associated controls not listed in above scope. <br />• Asbestos removal or remediation. <br /> <br /> Replace one (1) ductless split system unit with a new high efficiency unit of similar size and capacity. <br />Please refer to the HVAC Mechanical Inventory for equipment size and location. <br /> <br />The Scope of Work includes: <br />• Removal and proper disposal of the existing unit per EPA guidelines. <br />• Proper disposal or containment of refrigerant. <br />• Installation of one (1) new split system unit with programmable thermostat. <br />• Disconnection/reconnection of the existing electrical service. <br />• Disconnection/reconnection of existing condensate drain line (installation of new <br />condensate pump as required). <br />• Start-up/testing of the new unit. <br />The Scope of Work excludes: <br />• Undisclosed electrical and structural upgrades/modifications. <br /> <br />Lighting Retrofit existing interior T8 fluorescent lighting systems with new high efficiency LED lighting <br />systems. Please see the Lighting Summary in Attachment B for detailed information on lighting scope, <br />quantities, and locations. <br /> <br /> Retrofit existing exterior building-mounted CF lighting systems with new high efficiency LED lighting <br />systems. Please see the Lighting Summary in Attachment B for detailed information on lighting scope, <br />quantities, and locations. <br /> <br />Public Works <br />Controls <br /> Expand the existing Johnson Controls BAS to three (3) HVAC units serving the Parks, Building <br />Maintenance, and Shop buildings. <br /> <br />The Scope of Work includes: <br />• Disconnection and removal of the existing thermostats. <br />• Installation of new control wiring as necessary. <br />• Installation of new wall mounted temperature sensors. <br />• Engineering, programming, commissioning, documentation, graphics, and start-up. <br />• Integration to the City’s existing Johnson Controls BAS network server. <br />The Scope of Work excludes: <br />• Any required upgrades or improvements to the existing network. <br />DocuSign Envelope ID: 64BB0189-33AC-48E9-B1D7-D912FB4998D8
The URL can be used to link to this page
Your browser does not support the video tag.