My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240102
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 10:56:51 AM
Creation date
2/23/2024 3:26:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/2/2024
Retention
PERM
Document Relationships
Reso 2024-002 CLIMATEC PHASE III PROJECT
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Installation Agreement – Att A <br />Page 13 of 17 <br /> <br />The Scope of Work includes: <br />• Verify control components wired to each controller, including disconnecting wire to <br />confirm failures are reporting correctly. <br />• Verify operation of all phases for each piece of HVAC equipment connected to the BAS <br />in heating, cooling and/or economizer modes. <br />• Verify valve and/or damper actuators are operating correctly according to the control <br />signals. <br />• Reprogram equipment occupied/unoccupied schedules and set points according to <br />facility occupied hours. <br />• Provide a system start-up and report indicating system deficiencies. <br />The Scope of Work excludes: <br />• Any repair or replacement of existing control system components. <br /> <br />Mechanical <br /> Replace one (1) water-cooled chiller, one (1) chilled water pump, and one (1) condenser water pump <br />with new high efficiency units of similar size and capacity. <br /> <br />The Scope of Work includes: <br />• Removal and proper disposal of the existing chiller and pumps per EPA requirements. <br />• Installation of one (1) new water-cooled chiller and two (2) new pumps. <br />• Disconnection/reconnection of the existing electrical service. <br />• Disconnection/reconnection of existing chilled water and condenser water piping (at inlet <br />and outlet of unit). <br />• Disconnection/reconnection to the existing BAS. <br />• Start-up/testing of the new units. <br />• Final engineering will determine new chiller design specifications. <br /> <br />The Scope of Work excludes: <br />• Electrical upgrades/modifications not specifically included in the scope. <br />• Repairs such as, but not limited to, water leaks, expansion tanks, piping, valves/actuators, <br />chiller water feed, associated water circulating pumps and associated controls, not <br />specifically included in the scope. <br /> <br /> Replace four (4) roof-mounted air handling units with new high efficiency units of similar size and <br />capacity. Please refer to the HVAC Mechanical Inventory for equipment size and location. <br /> <br />The Scope of Work includes: <br />• Removal and proper disposal of the existing units per EPA guidelines. <br />• Installation of four (4) new air handling units. <br />• Necessary piping modifications at the inlet and outlet of each replacement unit. <br />• Replacement of existing control valves at the new units. <br />• Duct/curb modifications needed to install units. <br />• Disconnection/reconnection of the existing electrical service. <br />• Disconnection/reconnection to the existing controls. <br />DocuSign Envelope ID: 64BB0189-33AC-48E9-B1D7-D912FB4998D8
The URL can be used to link to this page
Your browser does not support the video tag.