My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240102
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 10:56:51 AM
Creation date
2/23/2024 3:26:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/2/2024
Retention
PERM
Document Relationships
Reso 2024-002 CLIMATEC PHASE III PROJECT
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Installation Agreement – Att A <br />Page 16 of 17 <br /> <br />• Provide a system start-up and report indicating system deficiencies. <br />The Scope of Work excludes: <br />• Any repair or replacement of existing control system components. <br /> <br />Mechanical <br /> Replace four (4) packaged HVAC units with new high efficiency units of similar size and capacity. <br />Please refer to the HVAC Mechanical Inventory for equipment size and location. <br /> <br />The Scope of Work includes: <br />• Removal and proper disposal of the existing units per EPA guidelines. <br />• Proper disposal or containment of refrigerant. <br />• Installation of four (4) new packaged units. <br />• Duct/curb modifications needed to install units. <br />• Disconnection/reconnection of the existing electrical and gas service. <br />• Installation of new electrical disconnects. <br />• Protective coil coatings on the new units. <br />• Installation of economizers and MERV 13 filters as per manufacturer’s recommendations. <br />• Disconnection/reconnection of existing condensate drain lines. <br />• Disconnection/reconnection to the existing BAS. <br />• Start-up/testing of the new units. <br />The Scope of Work excludes: <br />• Undisclosed electrical and structural upgrades/modifications. <br /> <br />Pool Circulation Pump <br /> Provide and install a new aquatic management system equipped with a variable frequency drive (VFD) <br />to control the existing Recreation Pool circulation pump. <br /> <br />The Scope of Work includes: <br />• Installation of a new aquatic management system with VFD to control one (1) existing 20 <br />HP pool circulation pump. <br />• The system will work in tandem with the existing filter and chemical controls. <br />• Start-up/testing of the new system. <br />• Final engineering to determine VFD specifications. <br />The Scope of Work excludes: <br />• Undisclosed electrical and structural upgrades/modifications. <br />• Replacement and/or repair of the existing filtration equipment, chemical control systems, <br />and pool heating equipment. <br /> <br />Lighting <br /> Retrofit existing interior T8 fluorescent, T12 fluorescent, CF, and incandescent lighting systems with <br />new high efficiency LED lighting systems. Please see the Lighting Summary in Attachment B for <br />detailed information on lighting scope, quantities, and locations. <br /> <br /> Retrofit existing exterior building-mounted CF lighting systems with new high efficiency LED lighting <br />systems. Please see the Lighting Summary in Attachment B for detailed information on lighting scope, <br />quantities, and locations. <br />DocuSign Envelope ID: 64BB0189-33AC-48E9-B1D7-D912FB4998D8
The URL can be used to link to this page
Your browser does not support the video tag.