My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240102
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 10:56:51 AM
Creation date
2/23/2024 3:26:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/2/2024
Retention
PERM
Document Relationships
Reso 2024-002 CLIMATEC PHASE III PROJECT
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location Existing Fixture Description kWQty Retrofit Code Description (Ltg control in RED)Hours kWh <br />PRE-RETROFIT POST RETROFIT <br />Qty kW SvdWt/Fxt kWh SvdHourskWhkWWt/Fxt <br />Public Works - <br /> (sorted by building, floor, area) <br />City of San Leandro - Lighting Detail Report <br />404 404Qty and kW for Public Works : 29.2 <br /> kWh for Public Works : 85,453 <br />15.6 <br />38,124 <br />13.6 <br />47,328 <br />Public Works Lighting Page 39W* = wall switch sensor; C* = ceiling sensor; E* = existing sensor, L* Dimming Control <br />DocuSign Envelope ID: 64BB0189-33AC-48E9-B1D7-D912FB4998D8
The URL can be used to link to this page
Your browser does not support the video tag.