<br />○ Pre-demolition survey for asbestos will include existing buildings and structures previously <br />not covered by GHD study, Fishing Pier, wooden sea wall. <br />○ Previous GHD marine sediment testing indicates concentration of metals and PCBs below <br />respective RWQCB environmental screening levels for residential soil. <br />● Prepare abatement specifications for handling and removal of hazardous materials based on the <br />results of the previous hazardous materials assessments and the results of the pre-demolition <br />survey(s). <br />Task 2.4 – Environmental Investigations <br />● Perform a current Phase I Environmental Site Assessment (ESA) – Previous Phase I ESA was <br />performed in 2017. <br />○ Phase I ESA will include review of previous environmental investigations to determine the <br />extent of additional environmental exploration needed. <br />● Perform a limited Phase II Environmental Site Assessment to supplement previous soil and <br />groundwater sampling activities performed in 2017. <br />○ Sampling activities to include additional investigation of potential residual impact from <br />presence of former UST near the vicinity of the Harbor Master’s Office <br />○ Perform a Soil Vapor Assessment <br />Task 2.5 – Geotechnical Report <br />● Analyze and review data from previous site geotechnical reports <br />● Consultant shall drill additional borings for up to three (3) days at various locations throughout the <br />site, based on current project and proposed improvements <br />● Test soil samples from borings in a laboratory including moisture content, gradation, Atterberg <br />Limits, strength testing, consolidation, and corrosivity. Test results will be presented in an appendix <br />in the geotechnical report. <br />● Analyze the subsurface conditions from previous geotechnical assessments, new geotechnical <br />borings, and laboratory test results and prepare a geotechnical report that will include the following: <br />○ Site seismicity and seismic hazards, including the potential for liquefaction, lateral spreading, <br />and estimated seismically induced settlement <br />○ Treatment of geotechnical constraints such as loose/soft surface soil, existing fill, <br />compressible soil, expansive soil, liquefiable soil, and lateral spreading, as necessary, based on <br />field exploration results <br />○ Analysis of potential total and differential settlement due to liquefaction and consolidation <br />○ Conceptual measures to mitigate hazards, geotechnical constraints, and predicted <br />settlements <br />○ Foundation design recommendations for recommended foundation types of the proposed <br />storage, maintenance, restroom, and recreational structures and California Building Code <br />(CBC) seismic design criteria <br />○ Foundation design recommendations for overwater overlook and boat ramp including lateral <br />loading design parameters for input into L-Pile <br />○ Slope stability analysis of the existing and proposed embankments and mitigation measures <br />for slope instability, as needed <br />○ Site grading recommendations, including fill placement recommendations, utility backfill, and <br />recommendations for site drainage <br />○ Retaining wall recommendations