<br />interagency meeting (see Task 5.2) to gauge the regulatory feasibility of the mitigation options. Once a <br />feasible mitigation option has been verbally agreed upon by the City and the applicable regulatory agencies, <br />CONSULTANT will prepare a second memorandum outlining the mitigation concept in a manner that can be <br />incorporated into permit applications. <br />Subtask 2.10 —Sedimentation Testing at Boat Launch <br />Previous testing of lagoon and perimeter sediments where work is planned to occur indicate that the <br />material was suitable for a combination of Unconfined Aquatic Disposal and placement at the Dredged <br />Material disposal ponds near the Golf Course. Although minimal to no dredging is proposed within the <br />marina berth areas, the new Boat Launch area will require dredging of materials that have not been dredged <br />before. Sampling and testing, consistent with guidance from the Dredged Material Management Office <br />(DMMO), will be needed for the proposed dredging and disposal of excavated material. Specific tasks <br />associated with this include Pacific EcoRisk performing the following: <br />● Preparation of the Sampling and Analysis plan (SAP) to be submitted to DMMO for approval of the <br />sampling program <br />● Sediment sampling based on DMMO requirements (4 sediment cores, one composite sample tested) <br />● Laboratory analysis based on typical DMMO requirements <br />● Preparation of the Sediment Test Results (STR) to be submitted to DMMO <br />● Participation in meetings with DMMO <br /> <br />DELIVERABLES: <br />All deliverables shall be pdf format except as noted below. <br />● Bathymetric Survey <br />● Existing document summary <br />● Environmental Data Request List <br />● Geotechnical Report <br />● Hazardous Materials Abatement Specifications <br />● Hazardous Materials Report <br />● Memorandum of known compensatory mitigation options <br />● Memorandum summarizing project’s compensatory mitigation approach to be proposed in permit <br />applications <br />● One draft and one final Arborist Report <br />● One draft and one final Biological Resources Technical Memorandum <br />● Phase I Environmental Site Assessment <br />● Phase II Environmental Site Assessment to assess the former UST location and to supplement <br />previous sampling activities (increase spatial coverage of sample locations, include limited soil vapor <br />assessment) <br />● Project Issues and Constraint Summary <br />● Sediment Sampling and Analysis Plan <br />● Sediment Testing Results <br />● Supplemental Topographic Survey in AutoCad and pdf <br /> <br />SCHEDULE: <br />Task 2 shall be completed within 26 weeks of notice to proceed. <br /> <br />TASK 3 – DESIGN DEVELOPMENT