Laserfiche WebLink
<br />Consultant shall develop plans, specifications, and estimates for one bidding package with add alternates as <br />listed here. <br />● Package 1, Zone 1/ Phase 1 Mulford point, Pescador Point, Boat Launch and Zone 2 Shared Parking <br />(Add Alternate), all as described in the RFP, work shall include: <br />o Marina demolition & decommissioning including: <br />▪ Neptune Drive Sea Wall Replacement (Demo wood structure and replace with concrete <br />seawall) <br />▪ Sea Plane Launch and coastal zone immediately south towards El Torito <br />(Demo/Rebuild Shoreline) <br />▪ Pescador Boat Lift (Demo) <br />▪ Pescador Boat Ramp (Demo/Rebuild shoreline) <br />▪ Fishing Pier (Demo) <br />o Landside Demolition <br />o Rip Rap Extension <br />o Grading and sea level rise mitigation <br />o Interim Bay Trail <br />o Shared Parking lot <br />o Utility Coordination <br />o Hydroseed or similar ground surface treatment <br />o Pescador Point restroom and boat launch <br /> <br />Work shall include but not be limited to the following tasks required to complete the overall scope of work <br />described herein. <br />Subtask 3.1 – 50% Design Development <br />● Prepare the 50% Design Development Plans and Estimates based on the Marina Decommissioning <br />report, Coastal Engineering report, Conceptual Design for Shoreline Improvements, data collection, <br />project goals and project budget. <br />● Develop a utility and infrastructure Masterplan which documents the electrical (EV chargers, <br />Lighting), data, dry utility, City fiber backbone, wet utilities and irrigation needs for project packages <br />2, 3 and 4. Detailed utility plans, profiles and calculations are excluded. This plan shall provide the <br />sizing, inverts, and conforms required for Bid Package 1 (zones 1 and 2, and key areas of zones 3 and <br />4 identified in Attachment E) to support the park expansion in future phases. <br />● Coordinate all work including: limits of work, temporary pedestrian access, construction access, <br />lagoon demo access, existing elements to remain, demolition, surcharging, grading, utilities and <br />services, future utility connections, and perimeter conforms f or each package. <br />● Coordinate conforms of adjacent private development including perimeter conforms, construction <br />phasing, development schedule, Interim access as described in Subtask 3.5, surcharging, sea level rise <br />mitigation, grading and drainage, wet and dry utilities, fire access, garbage access, lighting, parking, <br />park elements, kayak and canoe storage facilities, and views. <br />● Provide traffic safety analysis, specifically regarding vision sight triangle and pedestrian crossings <br />within the project limits. The analysis will be shown on site exhibits, at no more than four locations. <br />● Develop overall irrigation master plan showing services, anticipated water meter sizes for ultimate <br />project buildout