Laserfiche WebLink
<br />o Landscape Layout Plans <br />o Layout enlargements of: <br />▪ Interim Mulford Point Overlooks (2) <br />o Landscape Materials Plans <br />o Landside Planting Plans and Details integrating ReScape requirements including native <br />planting buffers, coastal planting, Lawn areas, Stormwater Treatment basins, windbreak <br />planting, and habitat planting <br />o Irrigation Masterplan for controller systems and both permanent and temporary irrigation <br />systems <br />o Environmental Graphic Signage Plans for Package 1 <br />▪ Bay Trail Sign <br />▪ Park identification / Entry sign <br />▪ Mileage markers <br />▪ Historical replacement plaque for Oyster Beds Mosaic <br />▪ Interpretive and Educational Signage Plan and Elevations for up to 9 signs <br />▪ Support on text & technical markups for signage <br />o Preliminary construction details for Landscape work including: <br />▪ Planting, Boulders, Import soil, Seat walls, Site Furniture, Drinking Fountains, Bay Trail, <br />Pavement Sections, <br />o Preliminary construction details for all Civil, Coastal, Electrical, Geotechnical, and Structural <br />work. <br />o Shoreline improvements Plans along the park edges <br />o Marine Engineering plans and details for <br />▪ Neptune Drive sea wall <br />▪ Boat ramp <br />▪ Floating Kayak launch and canoe storage <br />o Lighting Plans - conceptual for typical spaces for comment/review <br />o Photometric Plans - preliminary typical areas only <br />o Electrical Plans - major equipment only <br />o Colored utility plan exhibit depicting all known existing dry utilities <br />o Preliminary Joint Trench Intent plans showing joint trench route, based on utility data and <br />field investigation. Locate transformers, Telephone, CATV and Electrical equipment, Electric <br />panel sizes and voltages- Utility Boxes will not be included at this stage. <br />o Conceptual prefabricated Building Plans, stall configurations to minimize bathing and <br />vandalism, layouts and fixtures including security doors, water heaters, lavatories, urinals, <br />dispensers, sinks, materials, finishes, roofing types, colors, and building elevations. <br />● Prepare 50% Cost estimate for Package 1 <br />● Prepare a single outline specification book covering work within Package 1 <br />Subtask 3.2 – 100% Design Development <br />● Coordinate a Joint Resolution Team (JRT) meeting to review 50% Design Development Plans and <br />Estimate. <br />● Prepare response to 50% DD comments on a JRT comment/ response matrix. <br />● Prepare revised 100% Design Development package for submittal integrating City comments, <br />stakeholder/ tribal comments, project updates, agency requirements, and coordination.