My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240220
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 4:16:04 PM
Creation date
2/23/2024 4:28:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/20/2024
Retention
PERM
Document Relationships
Gates & Associates, Inc CSA 20240305
(Amended)
Path:
\City Clerk\City Council\Agreements\2024
Reso 2024-012 Gates and Associates for Shoreline Park Project
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Owner in the online posting and submittal process. <br /> <br />DELIVERABLES: <br />All deliverables are in pdf format unless otherwise specified. <br />● Building Permit <br />● PG&E application <br />● EBMUD application and coordination <br />● Written request to be added to ACE Interagency Meeting Agenda <br />● Draft and Final PowerPoint slide deck for use at Inter agency Meeting <br />● Vulnerability Assessment <br />● Draft and final permit application packages <br />○ One draft and final application packages ACE and BCDC <br />○ One draft 401 WQC application for review by project team <br />○ One draft 401 WQC application for review by RWQCB <br />○ One final 401 WQC application for review by project team <br />○ One final 401 WQC application for submittal to RWQCB <br />● Draft and final BA/EFH Analysis to support ACE Section 7 Consultation with NMFS and USFWS <br />● Draft and Final Cultural Resources Report <br />● Written fee payment instructions and calculated fee amounts to be paid by the City <br />● Written responses to comments received from agencies <br />○ Up to four rounds of responses to BCDC comments <br />○ Up to two rounds of responses to RWQCB and ACE comments (each) <br />○ Up to two rounds of responses to NMFS and USFWS comments (each) <br /> <br />MEETINGS: <br />One Interagency Meeting 1 <br />Presentations to BCDC Up to 3 <br />Meetings with the RWQCB Up to 2 <br />Meetings with the ACE, NMFS, and/or USFWS, combined Up to 2 <br /> <br />SCHEDULE: <br />Consultant shall respond to comments on permit submittals within 4 weeks of issuance of comments. <br />Permit duration is anticipated for a duration of up to 104 weeks. <br /> <br />TASK 6 – BIDDING SERVICES <br />Consultant shall provide bid support and conform drawings as described below. <br />Subtask 6.1 – Bid Support <br />● Attend and conduct Pre-Bid Conference <br />● Assist the City with responses to bidder’s inquiries through the City’s Project Manager. <br />● Assist the City with addenda to the construction documents as needed to respond to bidder’s <br />inquiries and clarify the intent of bid documents. <br />● Coordinate design team for providing Bid Addenda and narratives. <br />● Assist the City in evaluating bids
The URL can be used to link to this page
Your browser does not support the video tag.