My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240220
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 4:16:04 PM
Creation date
2/23/2024 4:28:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/20/2024
Retention
PERM
Document Relationships
Gates & Associates, Inc CSA 20240305
(Amended)
Path:
\City Clerk\City Council\Agreements\2024
Reso 2024-012 Gates and Associates for Shoreline Park Project
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />● Meeting Agendas & Minutes <br />● Post Construction Report <br />● Pre-construction notices to agencies <br />● Post-construction notices to agencies <br /> <br />MEETINGS: <br />Pre-construction Meeting 1 <br />OAC Site Meetings 52 <br />Interim site inspections 12 <br />Final Punch 3 <br />Post Construction Review 1 <br /> <br />SCHEDULE: <br />Consultant shall provide Construction Administration services for a duration of 52 weeks from the <br />construction notice to proceed. <br /> <br />TASK 8 – OPTIONAL SERVICES <br />The objective of this task is to provide additional services that may not have been included in the base project <br />scoping or could be an optional additional effort. Subtask 8.3 will require more information and shall be <br />negotiated upon request for service. <br />Subtask 8.1 — Blue Dolphin Sediment & Soils Testing <br />● Hand sampling techniques will be utilized to collect soil samples from six locations across the land <br />side footprint of the former Blue Dolphin Structure. Two soil samples will be collected from each <br />location (0 to 6-inch and 6 to 12-inch depth intervals). <br />● Hand sampling techniques will be utilized to collect sediment samples from six locations within the <br />water side of the former footprint of the Blue Dolphin structure. Samples will be collected from <br />exposed sediment at low tide. Two samples will be collected from each location (0 to 6-inch and 6 to <br />12-inch depth intervals). <br />● An additional sediment sample location will be situated approximately 200 feet east of the former <br />Blue Dolphin structure. Sediment samples from this location will be collected in the same manner <br />and frequency as described above. This sample location will serve as a control to determine if the <br />reported concentrations of target analytes are a result of impact from the burn area or represent <br />background concentrations for the marina sediments. <br />● The location, extent, and number of samples as well as sampling and testing methods will be <br />coordinated with the Waterboard as needed. <br />● Soil and sediment samples will be submitted to a state-accredited laboratory for analysis of the <br />following compounds on a discrete basis. <br />○ CAM 17 Metals by Environmental Protection Agency (EPA) Method 6010/7471 <br />○ Volatile organic compounds (VOCs) by EPA Method 8260B <br />○ Semi-volatile organic compounds (SVOCs) by EPA Method 8270 SIM <br />○ Asbestos by CARB 435A (400-point count) <br />● A sampling and testing report will be prepared, summarizing the sampling activity and laboratory <br />analytical results. Laboratory results will be compared to established soil screening levels to <br />determine appropriate soil handling, reuse, or disposal.
The URL can be used to link to this page
Your browser does not support the video tag.