My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240220
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2024 4:16:04 PM
Creation date
2/23/2024 4:28:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/20/2024
Retention
PERM
Document Relationships
Gates & Associates, Inc CSA 20240305
(Amended)
Path:
\City Clerk\City Council\Agreements\2024
Reso 2024-012 Gates and Associates for Shoreline Park Project
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />○ Respond to emails and phone calls after PG&E designs have been approved and prior to <br />construction start <br />○ Project coordination meetings after PG&E designs have been approved and prior to <br />construction start <br />● Provide Dry Utility Construction Administration <br />○ Respond to RFI’s and submittals <br />○ One jobsite visits <br />○ Respond to emails and phone calls <br />○ Meetings <br />○ Design updates and revisions for as built drawings. Actual locations of trenching and <br />equipment installation to be confirmed and provided by contractor or others. <br />Subtask 7.2 – Construction Observation <br />● Attend (12) twelve construction observation visits throughout the construction phase. Consultants <br />shall issue an observation report after each visit in accordance with the City timelines <br />● Attend walk-through of the Project site, review Contractor Punch List, and provide written response <br />with status and action of items on the Punch List. Consultant shall attend final walk -through of the <br />Project site with the City, verify Punch List completion, and provide written response with <br />recommendation regarding Project acceptance and close-out. <br />Subtask 7.3 – Construction Meetings <br />● Attend weekly OAC meetings for a duration of 12 months. <br />Subtask 7.4 – Post Construction Documentation & Training <br />● Review Contractor-supplied Operation and Maintenance manuals and Warranties to determine their <br />completeness and compliance with Construction Contract and provide written recommendation for <br />acceptance. <br />● Coordinate O&M training <br />● Prepare digital files of Record Drawings that reflect the changes to the work during construction <br />based upon marked up prints, drawings and other data furnished by the Contractor and City in the <br />approved City format. <br />● At ten (10) months following the issuance of final completion Consultant shall visit the site and: 1) <br />Review the work and identify observable defects and deficiencies, 2) Evaluate the performance, <br />durability and appearance of installed products, materials and system as they relate to suitability for <br />the intended use; 3) Evaluate the Project’s function and City’s use of the Project as reflection of the <br />original program intent; and 4) Submit a written memorandum to City concerning the foregoing no <br />later than 305 days after issuance of final completion. <br />● Preparation of post-construction notices to agencies as required by the project’s permits <br /> <br />DELIVERABLES: <br />● All documents shall be in PDF format unless otherwise specified <br />● Addenda <br />● Change order and Pay App review <br />● Submittal and RFI Responses <br />● Field Reports and Punch Lists <br />● Record Drawings (PDF and AutoCAD format)
The URL can be used to link to this page
Your browser does not support the video tag.