Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and <br />Gates & Associates, Inc for Staff Augmentation Exhibit A – Page 3 of 31 <br />● Conduct design team internal coordination meetings as required <br /> <br />DELIVERABLES: <br />All deliverables shall be in pdf format except as noted below. <br />● Meeting agendas and Notes <br />● Monthly Progress Reports <br />● Quality Control Plan <br />● Project Directory <br />● Project Budgets <br /> <br />TASK 2 – PRELIMINARY INVESTIGATION <br />Consultant shall review all existing information, collect supplemental information, and prepare <br />reports or other documents as required to support the design, drafting, and permitting of the <br />project. Work will include but not be limited to the following items required to complete the <br />overall scope of work described herein. <br />Task 2.1 – Data Collection <br />● Obtain and review applicable base data provided by the City of San Leandro which may <br />include: CAD files, existing plans, previous design efforts, previous regulatory agency <br />authorizations and agency correspondence, geotechnical report, studies, signal plans, as- <br />builts plans, record drawings, topographic surveys, prior demolition reports and <br />engineering studies to assess site conditions. <br />● Request documentation from all utility companies <br />● Request copies of City documentation for recent Bid Results and lessons learned <br />● Review environmental reports and prior dredging records to aid in preparation of a <br />materials handling plan and disposal strategy for the proposed demolition work <br />● Prepare an environmental data request list that outlines specific information and details <br />required by the various permit applications. The data request list will track items <br />requested by CONSULTANT, dates requested, dates fulfilled by other project team <br />members, and decisions made by the design team or City in response to the requests. <br />Example data requests include: <br />o project schedule and seasonal work windows <br />o list of construction equipment <br />o details on construction access and staging, etc. <br />● Conduct a visual reconnaissance survey to document field conditions, compare the <br />current conditions against descriptions and maps provided with prior documents such <br />that a base plan for the contract drawings, and a base plan for the shoreline <br />improvements can be prepared. <br />● Conduct site meeting with City Staff to review existing conditions, review existing <br />elements for demolition or salvage, and understand all perimeter conforms. <br />● Request City standards for Park development including: <br />○ EV chargers <br />○ Irrigation standards <br />DocuSign Envelope ID: 30A47DAA-8ADC-4C81-A393-00F3D4407ED9