My WebLink
|
Help
|
About
|
Sign Out
Home
Gates & Associates, Inc CSA 20240305
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
Gates & Associates, Inc CSA 20240305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2024 4:33:24 PM
Creation date
3/6/2024 4:33:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/5/2024
Retention
PERM
Document Relationships
5G Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2024\Packet 20240220
Reso 2024-012 Gates and Associates for Shoreline Park Project
(Amended by)
Path:
\City Clerk\City Council\Resolutions\2024
Link Groups
Link
1:
Gates & Associates, Inc CSA 20240305
Last modified:
3/6/2024 4:33:24 PM
Path:
\City Clerk\City Council\Agreements\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and <br />Gates & Associates, Inc for Staff Augmentation Exhibit A – Page 8 of 31 <br />mitigation options. Once a feasible mitigation option has been verbally agreed upon by the City <br />and the applicable regulatory agencies, CONSULTANT will prepare a second memorandum <br />outlining the mitigation concept in a manner that can be incorporated into permit applications. <br />Subtask 2.10 —Sedimentation Testing at Boat Launch <br />Previous testing of lagoon and perimeter sediments where work is planned to occur indicate that <br />the material was suitable for a combination of Unconfined Aquatic Disposal and placement at <br />the Dredged Material disposal ponds near the Golf Course. Although minimal to no dredging is <br />proposed within the marina berth areas, the new Boat Launch area will require dredging of <br />materials that have not been dredged before. Sampling and testing, consistent with guidance <br />from the Dredged Material Management Office (DMMO), will be needed for the proposed <br />dredging and disposal of excavated material. Specific tasks associated with this include Pacific <br />EcoRisk performing the following: <br />● Preparation of the Sampling and Analysis plan (SAP) to be submitted to DMMO for <br />approval of the sampling program <br />● Sediment sampling based on DMMO requirements (4 sediment cores, one composite <br />sample tested) <br />● Laboratory analysis based on typical DMMO requirements <br />● Preparation of the Sediment Test Results (STR) to be submitted to DMMO <br />● Participation in meetings with DMMO <br /> <br />DELIVERABLES: <br />All deliverables shall be pdf format except as noted below. <br />● Bathymetric Survey <br />● Existing document summary <br />● Environmental Data Request List <br />● Geotechnical Report <br />● Hazardous Materials Abatement Specifications <br />● Hazardous Materials Report <br />● Memorandum of known compensatory mitigation options <br />● Memorandum summarizing project’s compensatory mitigation approach to be proposed <br />in permit applications <br />● One draft and one final Arborist Report <br />● One draft and one final Biological Resources Technical Memorandum <br />● Phase I Environmental Site Assessment <br />● Phase II Environmental Site Assessment to assess the former UST location and to <br />supplement previous sampling activities (increase spatial coverage of sample locations, <br />include limited soil vapor assessment) <br />● Project Issues and Constraint Summary <br />● Sediment Sampling and Analysis Plan <br />● Sediment Testing Results <br />● Supplemental Topographic Survey in AutoCad and pdf <br /> <br />DocuSign Envelope ID: 30A47DAA-8ADC-4C81-A393-00F3D4407ED9
The URL can be used to link to this page
Your browser does not support the video tag.