My WebLink
|
Help
|
About
|
Sign Out
Home
Gates & Associates, Inc CSA 20240305
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
Gates & Associates, Inc CSA 20240305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2024 4:33:24 PM
Creation date
3/6/2024 4:33:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/5/2024
Retention
PERM
Document Relationships
5G Consent
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2024\Packet 20240220
Reso 2024-012 Gates and Associates for Shoreline Park Project
(Amended by)
Path:
\City Clerk\City Council\Resolutions\2024
Link Groups
Link
1:
Gates & Associates, Inc CSA 20240305
Last modified:
3/6/2024 4:33:24 PM
Path:
\City Clerk\City Council\Agreements\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and <br />Gates & Associates, Inc for Staff Augmentation Exhibit A – Page 10 of 31 <br />● Coordinate conforms of adjacent private development including perimeter conforms, <br />construction phasing, development schedule, Interim access as described in Subtask 3.5, <br />surcharging, sea level rise mitigation, grading and drainage, wet and dry utilities, fire <br />access, garbage access, lighting, parking, park elements, kayak and canoe storage <br />facilities, and views. <br />● Provide traffic safety analysis, specifically regarding vision sight triangle and pedestrian <br />crossings within the project limits. The analysis will be shown on site exhibits, at no more <br />than four locations. <br />● Develop overall irrigation master plan showing services, anticipated water meter sizes for <br />ultimate project buildout <br />● Coordinate needs for maintenance access, garbage access, Police access thru the project <br />site. <br />● Develop wet utility infrastructure master plans showing all storm, sewer, domestic water <br />services, and fire services for ultimate project buildout. <br />● Coordinate perimeter conform invert elevations of wet utilities <br />● Coordinate utility capacities and anticipated flows for storm drain, sanitary sewer and <br />domestic water. <br />● Review and Coordinate ReScape and Green Infrastructure requirements and <br />opportunities <br />● Develop project description for permitting and technical studies. <br />● Perform electrical load calculations for all electrical devices including but not limited to; <br />EV chargers, lighting, convenience power, irrigation and pre-fab buildings to determine <br />transformer sizing. <br />● Perform coastal engineering analyses to estimate armor rock size, rock gradation, and <br />required shoreline elevations around the limit of work within the marina basin and along <br />the Bay <br />● Conduct engineering analyses related to reconfiguration of the shoreline at the following <br />locations: <br />o The 2 boat launch ramps (McClure and Old Ramp) <br />o The Spinnaker Yacht Club (SYC) <br />o The fishing pier <br />o The former boat hoist piers south of the SYC <br />o Remnant pier foundations at the northwest corner of the marina basin <br />o Gangway abutments along the marina basin edge <br />o Neptune Drive Seawall replacement <br />o Sea plane launch and adjacent low area directly to the south. <br /> <br />● Prepare 50% Design Development plans for Package 1 based on National CAD Standards <br />including: <br />o Cover Sheet <br />o Legends and Notes <br />o Pedestrian Site Access plan <br />DocuSign Envelope ID: 30A47DAA-8ADC-4C81-A393-00F3D4407ED9
The URL can be used to link to this page
Your browser does not support the video tag.