<br />Consulting Services Agreement between City of San Leandro and <br />BKF for Shoreline Park at the Marina Exhibit A – Page 1 of 4 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Project Description: <br />The City’s Shoreline Development plan has a project to demolish existing improvements at the San <br />Leandro Marina and construct a new park along the existing jetties and at some locations into the water of <br />the SF Bay. An inventory of items at the Marina that may be demolished is contained in a report by GHD <br />dated January 2018 and concept plans for the new park are illustrated in a presentation created by Gates <br />and Associates in October 2017. The project is adjacent to land that contains the Marina Inn and Horatio’s <br />restaurant, both of which are to remain. The project is also adjacent to land that is proposed for <br />development as described in an agreement between the City and Cal Coast Companies dated July 22, <br />2020. <br /> <br />Refer to the site exhibit, titled “Limit of Work Map” attached to this agreement for the project limit, which <br />includes areas that are hatched. <br /> <br />The improvements generally include landscaping, paving, two public restrooms, and water access ramps. <br />Except where improvements provide access to the water or transition to existing work to remain, new <br />improvements are to be built above the central bound sea level rise, it is envisioned that this will be <br />accomplished by raising the grade of the jetties about three feet. Any additional jetty height will require <br />protection from erosion. The restrooms are envisioned to be pre-fabricated off site, foundations and utility <br />connections will be built on site. The project shall develop concepts for and provide room for adaptations <br />necessary to protect these improvements against the upper bound sea level rise. Improvements required <br />to protect the area from the upper bound sea level rise are not included in the project, they will be designed <br />and installed as part of a future phase of the project. The bridge over the marina entrance is anticipated to <br />be constructed in a future phase, the first phase will thus locate the ‘bay trail’ along the east edge of the <br />existing marina basin. <br /> <br />The construction estimate for the project, including demolition, jetty stabilization, soil import, and park <br />improvements is $34M; however, City has only identified $22M in funding for this work. A cost estimate <br />and narrative will be issued for value engineering options to reduce the cost of construction and / or <br />phasing of park improvements will be necessary unless additional funding is identified. It is anticipated that <br />the Project will be separated out into phases to meet the construction estimate. This estimate does not <br />include soft costs or the owner’s contingency. <br /> <br />Scope of Work: <br />This contract is for 30% design of the project as described below. <br /> <br />Task 1: Project coordination and management <br />• Correspond with City as required to clarify work and get direction. <br />• Deliver direction to and coordinate work of the design team. <br />• Ensure the estimated cost of the design is within the construction estimate. <br />Deliverable: Meeting minutes <br />Schedule: As needed/ongoing <br /> <br />DocuSign Envelope ID: 5165BDF7-B7E7-4364-9995-BB0EC8A21F0EDocuSign Envelope ID: 8072AF55-5E04-4E15-BB69-8A23564F49F9