My WebLink
|
Help
|
About
|
Sign Out
Home
RRM Design Group CSA 20240321
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
RRM Design Group CSA 20240321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2024 5:02:56 PM
Creation date
4/15/2024 5:02:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/21/2024
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consulting Services Agreement between City of San Leandro and Last revised 3/21/24 <br />RRM Design Group for Conceptual Design Services Exhibit A – Page 2 of 3 <br />Subtask I.E: Preliminary Opinion of Cost – Previously Subtask I.B from Breezeway Conceptual <br />Design Proposal <br />Consultant will prepare a preliminary cost analysis exercise to determine the cost of the type of <br />improvements explored in Subtask 1.B – Explore Breezeway Improvement Ideas. <br />Deliverables: <br />o Preliminary opinion of cost <br />Subtask I.F: Base Map <br />Utilizing the measurements of one City-Selected breezeway taken by Consultant onsite in Task ID <br />(Field Investigation), Consultant will create a base map sufficient for the conceptual design. <br />Deliverables: <br />o Base map <br />Task II: Conceptual Design <br />Subtask II.A: Draft Concept Plan <br />Consultant will prepare a black and white concept plan supported by photographic character <br />imagery <br />to help communicate the design intent. Consultant will present the plan to City staff at a virtual or in <br />person meeting to obtain feedback before moving to the next task (Subtask II.B). <br />Deliverables: <br />o Black and white draft conceptual plan <br />o Attend one (1) meeting <br />Subtask II.B: Final Concept Plan <br />Based on staff feedback on the draft conceptual plan, Consultant will revise and finalize the <br />concept plan. Consultant will also prepare a site materials and furnishings selection, as well as a <br />preliminary plant palette to be reviewed by staff, and will present the final concept plan, <br />materials/furnishings, and preliminary plant palette to City staff at an in -person or virtual meeting. <br />Consultant will incorporate comments received at this meeting and prepare a final, colored plan, <br />preliminary plant palette, and furnishings/materials board. <br />Deliverables: <br />o Color final conceptual plan <br />o Materials and furnishings board <br />o Preliminary plant palette <br />o Attend one (1) meeting <br />Task III: Construction Visits and Recommendations <br />Upon request by the City, Consultant will provide construction assistance services as outlined below. <br />The City will provide construction management services to a construction contractor to implement the <br />design completed by Consultant in the final concept plan. Since construction documentation is not <br />included in Consultant’s scope of work, Consultant will not provide technical expertise related to the <br />implementation of the concept design. <br />Subtask III.A: Construction Visits and Recommendations <br />DocuSign Envelope ID: 1DB5F2E6-33BC-430B-8E0D-275CF158AF00
The URL can be used to link to this page
Your browser does not support the video tag.