Laserfiche WebLink
Treatment Wetland Project Detailed Report, 2/14/2024 <br />73 / 85 <br />5.4.1. Construction Vehicle Control Strategies <br />Non-applicable. No control strategies activated by user. <br />5.5. Architectural Coatings <br />Phase Name Residential Interior Area Coated <br />(sq ft) <br />Residential Exterior Area Coated <br />(sq ft) <br />Non-Residential Interior Area <br />Coated (sq ft) <br />Non-Residential Exterior Area <br />Coated (sq ft) <br />Parking Area Coated (sq ft) <br />5.6. Dust Mitigation <br />5.6.1. Construction Earthmoving Activities <br />Phase Name Material Imported (cy)Material Exported (cy)Acres Graded (acres)Material Demolished (Ton of <br />Debris) <br />Acres Paved (acres) <br />Demo (Ph 1.2)0.00 0.00 0.00 6,000 — <br />Initial Site Prep (PH 1.1)——22.5 0.00 — <br />Grading (Ph 1.3-1.5)11,000 —20.5 0.00 — <br />Grading (Ph 3.3)——0.00 0.00 — <br />5.6.2. Construction Earthmoving Control Strategies <br />Non-applicable. No control strategies activated by user. <br />5.7. Construction Paving <br />Land Use Area Paved (acres)% Asphalt <br />City Park 0.00 0% <br />5.8. Construction Electricity Consumption and Emissions Factors <br />kWh per Year and Emission Factor (lb/MWh) <br />Year kWh per Year CO2 CH4 N2O <br />2024 0.00 204 0.03 < 0.005