My WebLink
|
Help
|
About
|
Sign Out
Home
5B CONSENT
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240402
>
5B CONSENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:24:00 AM
Creation date
4/19/2024 9:10:55 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/2/2024
Retention
PERM
Document Relationships
Reso 2024-029 MND for WPCP Treatment Wetland and Shoreline Resilience Project
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Environmental Checklist <br /> <br />San Leandro Treatment Wetland <br />IS/MND <br />3-14 February 2024 <br /> <br />lifetime exposure. As sensitive receptors are greater than 3,500 feet from the Proposed Project and <br />daily emissions for three months is estimated to maximize at 1.35 pounds per day. Accordingly, with <br />the distance and low level of emissions, Project related DPM emissions would not be considered <br />substantial and would not result in a significant incremental cancer risk. Therefore, the impact related <br />to exposing sensitive receptors to substantial pollutant concentrations would be less than significant. <br />There would be a de minimis increase in TAC emissions during operation of the Proposed Project <br />which would strictly be related to the potential for a diesel truck to be used by off-site service <br />personnel when such maintenance on the system is required. <br />Impact Designation: Less-than Significant Impact <br />d) Result in adverse impacts to a substantial number of people: During construction activities, <br />construction equipment exhaust would temporarily generate odors. However, any construction-related <br />odor emissions would be low in concentration and temporary in nature. Additionally, odors would <br />typically be confined to the immediate vicinity of the construction equipment and the nearest sensitive <br />receptor is over 3,500 feet to the south of the Proposed Project. By the time such emissions reach any <br />sensitive receptor sites, they would be diluted to well below any level of air quality concern. In <br />summary, construction-related odor emissions would be temporary, and the Proposed Project is not <br />considered the type of use that would generate odors that would affect a substantial number of <br />people. <br />The Proposed Project would result in the conversion of a wastewater storage basin into a freshwater <br />treatment wetland. Therefore, the Proposed Project would not result in a change in land use that <br />would generate significant new types of odors and no objectionable odors are anticipated to result <br />from the operational activity of the Proposed Project. <br />Impact Designation: Less-Than-Significant Impact. <br />Cumulative Impacts on Air Quality <br />According to BAAQMD guidance, a project's contribution to cumulative air quality impacts would be considered <br />significant if its individual impact is deemed significant or if it conflicts with the applicable clean air plan. As <br />previously discussed, the Project is not anticipated to result in any significant air quality impacts during <br />construction or operation, as its emissions are projected to remain well below the BAAQMD significance <br />thresholds. Consequently, its contribution to the cumulative air quality impact in the Bay Area is not expected <br />to be cumulatively considerable, indicating that the associated impact would be less than significant.
The URL can be used to link to this page
Your browser does not support the video tag.