Laserfiche WebLink
3. Environmental Checklist <br /> <br />San Leandro Treatment Wetland <br />IS/MND <br />3-30 February 2024 <br /> <br />inefficiencies. The focus of energy-related impacts is thus on the Project's operational phase. The operation of <br />the Proposed Project will require additional energy, potentially leading to slightly higher electricity demand <br />compared to current levels. Nonetheless, the Project's design promotes energy efficiency compared to other <br />wastewater treatment and nitrogen removal methods, minimizing wasteful energy use. Similarly, other <br />cumulative projects in the vicinity will consume fuel and energy for construction and operation. However, these <br />projects are expected to adhere to existing energy efficiency policies, ensuring that any increase in energy <br />demand does not equate to inefficient or wasteful energy use. Therefore, the combined effect of these <br />projects, including the Proposed Project, is not anticipated to cause significant cumulative energy impacts.