My WebLink
|
Help
|
About
|
Sign Out
Home
5B CONSENT
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240402
>
5B CONSENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:24:00 AM
Creation date
4/19/2024 9:10:55 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/2/2024
Retention
PERM
Document Relationships
Reso 2024-029 MND for WPCP Treatment Wetland and Shoreline Resilience Project
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Environmental Checklist <br /> <br />San Leandro Treatment Wetland <br />IS/MND <br />3-42 February 2024 <br /> <br />with Kinder Morgan, in accordance with their Developer Handbook.33 Project plans must be provided <br />to Kinder Morgan at least six weeks before construction commencement to allow for the receipt of an <br />approval letter, which may contain specific procedures to be followed. Additionally, before any <br />excavation occurs near the pipeline, the City or its contractor must notify 811 at least three days <br />before the excavation. <br />Excavation or ground disturbance in proximity to active pipelines requires the implementation of <br />protocols for informing the owners/operators in the event of an accidental rupture, followed by the <br />implementation of shutdown procedures. In line with the Developer Handbook, the City will promptly <br />notify Kinder Morgan’s Operations Supervisor or Area Manager if damage occurs to a pipeline. If the <br />damage results in releasing any flammable, toxic, or corrosive substance that poses a risk to life or <br />property, the City will immediately contact 911. Moreover, if the damage affects a pipeline not owned <br />by Kinder Morgan, the owner or operator of that pipeline must also be notified. <br />c) Within One-Quarter Mile of Schools: No existing or planned elementary, middle, intermediate, or high <br />schools are within 0.25 miles of the Project site. The nearest school facility is Garfield Elementary <br />School, approximately 0.95 miles southeast of the Project site. As discussed above, the Proposed <br />Project does not anticipate releasing hazardous emissions or handling acutely hazardous materials, <br />substances, or wastes in significant quantities. Construction activities associated with the Proposed <br />Project would use a limited amount of hazardous and flammable substances/oils during heavy <br />equipment operation for site excavation, grading, and construction. The amount of hazardous <br />chemicals present during construction would be limited and would be in compliance with existing <br />government regulations. <br />During operation, the Proposed Project site would not require the use, storage, disposal, or transport <br />of large volumes of hazardous materials that could cause severe environmental damage in the event <br />of an accident. Although hazardous substances would be present and utilized in limited amounts <br />within the Project site, they would typically be present in small quantities and can be cleaned up <br />without affecting the environment. In addition, the Project site is not within 0.25 mile of any schools. <br />Therefore, there would be no impact on potential exposure of hazardous emissions or acutely <br />hazardous materials, substances, or wastes within one-quarter mile of a school. <br />Impact Designation: Less than Significant Impact <br />d) Hazardous Materials Sites According to Government Code Section 65962.5: While there are several <br />release sites listed near the Project area, and some are included in the "Cortese" list as per <br />Government Code Section 65962.5, the Project site itself is not on this list.34 Therefore, the Proposed <br />Project would have less-than-significant impacts associated with lists of hazardous materials sites <br />compiled pursuant to Government Code Section 65962.5. <br />Impact Designation: No impact <br /> <br />33 Kinder Morgan. 2021. Developer Handbook: Guidance for Working Near or Adjacent to a Pipeline. Available at <br />https://www.kindermorgan.com/WWWKM/media/Documents/Public%20Awareness/KM_Developer_Handbook.pdf <br />34 Information Required From the State Water Resources Control Board (SWRCB) Under Government Code Section 65962.5(c). Accessed <br />on February 9, 2024. Available at https://calepa.ca.gov/sitecleanup/corteselist/section-65962-5c/
The URL can be used to link to this page
Your browser does not support the video tag.