My WebLink
|
Help
|
About
|
Sign Out
Home
5B CONSENT
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2024
>
Packet 20240402
>
5B CONSENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:24:00 AM
Creation date
4/19/2024 9:10:55 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/2/2024
Retention
PERM
Document Relationships
Reso 2024-029 MND for WPCP Treatment Wetland and Shoreline Resilience Project
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Environmental Checklist <br /> <br />San Leandro Treatment Wetland <br />IS/MND <br />3-44 February 2024 <br /> <br />manage vegetation. The Project site will be subject to routine inspections by the Alameda County <br />Mosquito Abatement District and USDA Wildlife Biologists. In the event of nuisance vegetation, <br />mosquito populations, or wildlife hazards, adaptive management strategies will be employed in <br />consultation with these agencies. Potential management actions may include vegetation management <br />or removal, periodic draining of the open water portion of the Project, stocking of mosquitofish, or <br />other controls recommended or mandated by the Alameda County Mosquito Abatement District or <br />USDA. <br />f) Interference with Emergency Plans: The Proposed Project would not result in any changes in the long- <br />term operations of the WPCP, ensuring no changes in the workforce size. Consequently, it would not <br />impede emergency evacuation procedures. As discussed in Section 3.18 (Transportation), <br />construction-related traffic would be confined to the construction phase and would not hinder <br />emergency vehicles. Temporary increases in traffic during construction are anticipated to be less than <br />significant. Furthermore, construction activities would be confined to WPCP premises, avoiding any <br />disruption to public roadways. Thus, the Proposed Project would not impair the implementation of, or <br />physically interfere with, an adopted emergency response or evacuation plan. <br />Impact Designation: No impact <br />g) Wildfires: Implementation of the Proposed Project is not expected to increase the exposure of people <br />or structures to a significant risk of loss, injury, or death involving wildland fires. As discussed in <br />Section 3.21 (Wildfires), Very High Fire Hazard Severity Zones in San Leandro are located east of I-580 <br />in the East Bay Hills, approximately 3.25 miles from the Proposed Project site. The Project site is <br />located within an urbanized industrial area of San Leandro and is surrounded by urban development. <br />The Project site is not within a state responsibility area or near a high fire hazard severity zone. <br />Impact Designation: No impact <br />Cumulative Impacts on Hazards and Hazardous Materials <br />Hazards associated with the Proposed Project are typically site-specific and do not usually result in cumulative <br />effects. However, construction sites often involve the use of hazardous materials, which could pose significant <br />risks to the public or the environment, particularly in the event of accidents or contamination spreading to <br />larger areas. Handling contaminated soil during construction also requires adherence to HAZWOPER training <br />and implementation to minimize worker impacts and ensure environmental safety. Furthermore, construction <br />activities near active fuel pipelines could present significant hazards due to the potential release of hazardous <br />materials into the environment. <br />When considering the Proposed Project along with past, present, and foreseeable projects, there is a possibility <br />of significant cumulative impacts related to hazards and hazardous materials. The handling of hazardous <br />materials during construction could contribute cumulatively to significant impacts. However, compliance with <br />applicable federal, state, and local regulations, along with the implementation of Mitigation Measures HZ-1 <br />and HZ-2, would substantially mitigate these impacts and those related to wildlife hazards to OAK. <br />The most significant cumulative projects in close vicinity are the future Monarch Bay Shoreline Development <br />Project, located approximately 1.2 miles south, and the ongoing implementation of the Oyster Bay Regional
The URL can be used to link to this page
Your browser does not support the video tag.