Laserfiche WebLink
EO - Contract <br />6 12 <br />LTP SLN <br />001 <br />City of San Leandro <br />4 EA Road Closed signs 159.00 636.00 <br />4 EA Sign braces 58.00 <br />4 EA Flagstands 159.00 <br />15 EA Type 1 barricades 52.46 <br />32 LF Chain link fence 190.06 <br />375 HRS Labor 120.00 <br />375 HRS Truck pick up 21.81 <br />500 EA Sandbags 1.00 <br />1000 LF Rope 0.60 <br />40000 SF Plastic Sheeting <br />0.50 <br />232.00 <br />636.00 <br />786.90 <br />6,081.92 <br />45,000.00 <br />8,178.75 <br />500.00 <br />600.00 <br />20,000.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />82,651.57 <br />At both sites A and B, plastic sheeting, weighted with sandbags was installed on the hillsides to prevent further erosion damage and <br />safety barricades were installed at the perimeter. <br />The roadway was closed to traffic. Road Closed signs and fencing were installed.