My WebLink
|
Help
|
About
|
Sign Out
Home
DeSilva Gates Agreement
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
DeSilva Gates Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 9:09:21 AM
Creation date
8/7/2024 9:09:18 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Last Revised: 06/12/2024 Page 4 Agreement <br />Annual Street Overlay/Rehabilitation 2019-21 – Phase II Project No. 2020.0050 <br />CONTRACT PRICE SCHEDULE <br /> <br />Item <br />No. Description <br />Estimated <br />Quantity <br />(A) <br />Unit of <br />Measure <br />Item UNIT Price <br />(in Words) <br />Item UNIT <br />Price <br />(in Figures) <br />(B) <br />TOTAL <br />PRICE <br />(in <br />Figures) <br />(AxB) <br />1. Mobilization and General <br />Conditions per Section 9-3.4 <br />LS 1 Five Hundred Eighty <br />Thousand Dollars <br />$580,000.00 $580,000.00 <br />2. Construction Surveying per <br />Section 2-9 <br />LS 1 Twenty-Five Thousand <br />Dollars <br />$25,000.00 $25,000.00 <br />3. Water Pollution Control and <br />SWPPP per Section 7-8.6 <br />LS 1 Twenty-Five Thousand <br />Dollars <br />$25,000.00 $25,000.00 <br />4. Traffic and Pedestrian <br />Control, Temp. Signage per <br />Section 600 <br />LS 1 Three Hundred Seventy <br />Thousand Dollars <br />$370,000.00 $370,000.00 <br />5. Clearing & Grubbing per <br />Section 300-1 <br />LS 1 Fifty Thousand Dollars $50,000.00 $50,000.00 <br />6. Potholing per Sections 5-1 <br />and 306-0 <br />LS 1 One Hundred Thousand <br />Three Hundred Ninety-Two <br />Dollars <br />$100,392.00 $100,392.00 <br />7. Adjust Water Valve Box to <br />Grade per Section 301-1.6 <br />EA 39 Two Thousand Dollars $2,000.00 $78,000.00 <br />8. Adjust Utility Manhole Frame <br />& Cover to Grade per <br />Section 301-1.6 <br />EA 37 Three Thousand Dollars $3,000.00 $111,000.00 <br />9. Adjust Sanitary Sewer <br />Lamphole Frame & Cover to <br />Grade per Section 301-1.6 <br />EA 2 Two Thousand Dollars $2,000.00 $4,000.00 <br />10. Adjust Monument Box & <br />Cover to Grade per Section <br />301-1.6 <br />EA 1 Two Thousand Dollars $2,000.00 $2,000.00 <br />11. Remove and Rebuild Survey <br />Monument per Section 309 <br />3.1 <br />EA 7 Four Thousand Dollars $4,000.00 $28,000.00 <br />12. Remove Obstructions from <br />Driveways per Section 300 <br />1.3 <br />EA 10 Three Hundred Dollars $300.00 $3,000.00 <br />13. Remove Traffic Loop <br />Detectors per Section 300- <br />1.3 <br />EA 96 Five Hundred Dollars $500.00 $48,000.00 <br />14. Remove Traffic Signal <br />Handhole Box & Cover per <br />Section 300-1.3 <br />EA 15 Five Hundred Dollars $500.00 $7,500.00 <br />15. Remove and Replace <br />Concrete Curb and Gutter <br />per Section 303-5 <br />LF 874 One Hundred Twenty-Five <br />Dollars <br />$125.00 $109,250.00 <br />16. Remove and Replace <br />Concrete Rolled Curb and <br />Gutter per Section 303-5 <br />LF 98 One Hundred Twenty-Five <br />Dollars <br />$125.00 $12,250.00 <br />17. Remove and Replace <br />Concrete Valley Gutter per <br />Section 303-5 <br />SF 923 Fifty Dollars $50.00 $46,150.00 <br />18. Remove and Replace <br />Concrete Curb Ramp per <br />Section 303-5 <br />SF 2,263 Fifty Dollars $50.00 $113,150.00 <br />Docusign Envelope ID: 16550F75-C810-4903-888B-56C0BAEA8DF8
The URL can be used to link to this page
Your browser does not support the video tag.