Last Revised: 06/12/2024 Page 5 Agreement
<br />Annual Street Overlay/Rehabilitation 2019-21 – Phase II Project No. 2020.0050
<br />19. Remove and Replace
<br />Concrete Sidewalk per
<br />Section 303-5
<br />SF 1,864 Twenty Dollars $20.00 $37,280.00
<br />20. Full Depth Base Repair (6
<br />Inches) per Section 302-3
<br />TON 203 Six Hundred Dollars $600.00 $121,800.00
<br />21. Full Depth Base Repair (8
<br />Inches) per Section 302-3
<br />TON 47 One Thousand Dollars $1,000.00 $47,000.00
<br />22. Asphalt Pavement Crack
<br />Sealing per Section 302-14
<br />LS 1 Forty Thousand Dollars $40,000.00 $40,000.00
<br />23. Cold Milling Asphalt
<br />Pavement (2.5-Inch Depth)
<br />per Section 302-1
<br />SY 4,463 Twelve Dollars $12.00 $53,556.00
<br />24. Cold Milling Asphalt
<br />Pavement (4.5-Inch Depth)
<br />per Section 302-1
<br />SY 9,128 Thirty Dollars $30.00 $273,840.00
<br />25. Remove Surfacing and Base
<br />per Setion 302-1
<br />CY 1,604 One Hundred Fifty
<br />Thousand Dollars
<br />$150.00 $240,600.00
<br />26. Remove FDR with Cement
<br />per Section 302-1
<br />CY 1,433 One Hundred Twenty-Five
<br />Thousand Dollars
<br />$125.00 $179,125.00
<br />27. Compact Existing Street
<br />Base or Subgrade Material
<br />per Section 301-1
<br />SY 5,631 Twenty-Five Thousand
<br />Dollars
<br />$25.00 $140,775.00
<br />28. Subgrade Over-Excavation
<br />(Revocable Item) per
<br />Section 301-1.3
<br />CY 187 Seventy Dollars $70.00 $13,090.00
<br />29. Full Depth Reclamation with
<br />Portland Cement (8-inch
<br />Depth) per Section 301-3.4
<br />SY 103 One Hundred Thousand
<br />Dollars
<br />$100.00 $10,300.00
<br />30. Full Depth Reclamation with
<br />Portland Cement (12-inch
<br />Depth) per Section 301-3.4
<br />SY 10,593 Fifteen Dollars $15.00 $158,895.00
<br />31. Soil Stabilization at Shallow
<br />Utilities per Section 3.4.9.1
<br />SY 209 Thirty Dollars $30.00 $6,270.00
<br />32. Portland Cement for FDR
<br />per Section 3.4.2.1
<br />TON 314 Two Hundred Dollars $200.00 $62,800.00
<br />33. HMA Paving per Section
<br />302-5
<br />TON 5,452 Two Hundred Dollars $200.00 $1,090,400.00
<br />34. RHMA Paving per Section
<br />302-9
<br />TON 2,793 Two Hundred Twenty
<br />Dollars
<br />$220.00 $614,460.00
<br />35. Remove Traffic Markers,
<br />Markings, Striping, and
<br />Signage per Sections 300-
<br />1.3, 314-2, and 314-3
<br />LS 1 Sixty Thousand Dollars $60,000.00 $60,000.00
<br />36. Traffic Markers, Markings,
<br />Striping and Signage per
<br />Sections 314-4, 315-5, and
<br />315-1
<br />LS 1 Six Hundred Ten Thousand
<br />Dollars
<br />$610,000.00 $610,000.00
<br />37. Bancroft/Estudillo Traffic
<br />Signal Modification per
<br />Section 702
<br />LS 1 Ten Thousand Dollars $10,000.00 $10,000.00
<br />38. Bancroft/Juana Traffic Signal
<br />Modification per Section 702
<br />LS 1 Ten Thousand Dollars $10,000.00 $10,000.00
<br />39. Bancroft/Dolores Traffic
<br />Signal Modification per
<br />Section 702
<br />LS 1 Ten Thousand Dollars $10,000.00 $10,000.00
<br />40. Bancroft Video Detection
<br />Installation
<br />LS 1 One Hundred Ninety
<br />Thousand Dollars
<br />$190,000.00 $190,000.00
<br />Docusign Envelope ID: 16550F75-C810-4903-888B-56C0BAEA8DF8
|