Laserfiche WebLink
Last Revised: 06/12/2024 Page 5 Agreement <br />Annual Street Overlay/Rehabilitation 2019-21 – Phase II Project No. 2020.0050 <br />19. Remove and Replace <br />Concrete Sidewalk per <br />Section 303-5 <br />SF 1,864 Twenty Dollars $20.00 $37,280.00 <br />20. Full Depth Base Repair (6 <br />Inches) per Section 302-3 <br />TON 203 Six Hundred Dollars $600.00 $121,800.00 <br />21. Full Depth Base Repair (8 <br />Inches) per Section 302-3 <br />TON 47 One Thousand Dollars $1,000.00 $47,000.00 <br />22. Asphalt Pavement Crack <br />Sealing per Section 302-14 <br />LS 1 Forty Thousand Dollars $40,000.00 $40,000.00 <br />23. Cold Milling Asphalt <br />Pavement (2.5-Inch Depth) <br />per Section 302-1 <br />SY 4,463 Twelve Dollars $12.00 $53,556.00 <br />24. Cold Milling Asphalt <br />Pavement (4.5-Inch Depth) <br />per Section 302-1 <br />SY 9,128 Thirty Dollars $30.00 $273,840.00 <br />25. Remove Surfacing and Base <br />per Setion 302-1 <br />CY 1,604 One Hundred Fifty <br />Thousand Dollars <br />$150.00 $240,600.00 <br />26. Remove FDR with Cement <br />per Section 302-1 <br />CY 1,433 One Hundred Twenty-Five <br />Thousand Dollars <br />$125.00 $179,125.00 <br />27. Compact Existing Street <br />Base or Subgrade Material <br />per Section 301-1 <br />SY 5,631 Twenty-Five Thousand <br />Dollars <br />$25.00 $140,775.00 <br />28. Subgrade Over-Excavation <br />(Revocable Item) per <br />Section 301-1.3 <br />CY 187 Seventy Dollars $70.00 $13,090.00 <br />29. Full Depth Reclamation with <br />Portland Cement (8-inch <br />Depth) per Section 301-3.4 <br />SY 103 One Hundred Thousand <br />Dollars <br />$100.00 $10,300.00 <br />30. Full Depth Reclamation with <br />Portland Cement (12-inch <br />Depth) per Section 301-3.4 <br />SY 10,593 Fifteen Dollars $15.00 $158,895.00 <br />31. Soil Stabilization at Shallow <br />Utilities per Section 3.4.9.1 <br />SY 209 Thirty Dollars $30.00 $6,270.00 <br />32. Portland Cement for FDR <br />per Section 3.4.2.1 <br />TON 314 Two Hundred Dollars $200.00 $62,800.00 <br />33. HMA Paving per Section <br />302-5 <br />TON 5,452 Two Hundred Dollars $200.00 $1,090,400.00 <br />34. RHMA Paving per Section <br />302-9 <br />TON 2,793 Two Hundred Twenty <br />Dollars <br />$220.00 $614,460.00 <br />35. Remove Traffic Markers, <br />Markings, Striping, and <br />Signage per Sections 300- <br />1.3, 314-2, and 314-3 <br />LS 1 Sixty Thousand Dollars $60,000.00 $60,000.00 <br />36. Traffic Markers, Markings, <br />Striping and Signage per <br />Sections 314-4, 315-5, and <br />315-1 <br />LS 1 Six Hundred Ten Thousand <br />Dollars <br />$610,000.00 $610,000.00 <br />37. Bancroft/Estudillo Traffic <br />Signal Modification per <br />Section 702 <br />LS 1 Ten Thousand Dollars $10,000.00 $10,000.00 <br />38. Bancroft/Juana Traffic Signal <br />Modification per Section 702 <br />LS 1 Ten Thousand Dollars $10,000.00 $10,000.00 <br />39. Bancroft/Dolores Traffic <br />Signal Modification per <br />Section 702 <br />LS 1 Ten Thousand Dollars $10,000.00 $10,000.00 <br />40. Bancroft Video Detection <br />Installation <br />LS 1 One Hundred Ninety <br />Thousand Dollars <br />$190,000.00 $190,000.00 <br />Docusign Envelope ID: 16550F75-C810-4903-888B-56C0BAEA8DF8